Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing , Adjusting & Balancing Report TAB-01323 Feb.,2023 AHU-01/1,2 & AHU-04, FCU-01/1,2,3,4,5,6…
GYPTO-Test Report-HEPA Filter Leak test
Sr. Doc. Name Doc No. Issue date Project System INSTALLED HEPA FILTER LEAK TEST REPORT HLT-01823 Jan.,2023 DP1 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-01923 Jan.,2023 DP1…
Park Street Mall
Sr. Doc. Name Doc No. Issue date Project System 1 Water Flow Rate Measurements Test Report WBR-00223 Jan.,2023 FCUs-01,03,04,05,06…
ALAMIN MEDICAL
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing , Adjusting & Balancing Report TAB-01123 Jan.,2023 AHU-01…
Integrated
Sr. Doc. Name Doc No. Issue date Project System 1 Testing , Adjusting & Balancing Report TAB-01023 Jan.,2023 AHU-01.01 & AHU-01.02…
GSK Pattern
Sr. Doc. Name Doc No. Issue date Project System 1 AIR VISUALIZATION TEST REPORT (Office / C0302) AVN-00223 Jan.,2023 Dispensing Area 2 AIR VISUALIZATION TEST REPORT (CH. Room / C0303) AVN-00323 Jan.,2023 Dispensing Area 3 AIR VISUALIZATION TEST REPORT (Air Lock / C0304) AVN-00423 Jan.,2023 Dispensing Area 4 AIR VISUALIZATION TEST REPORT (Row Material Assembly / C0305) AVN-00523 Jan.,2023 Dispensing Area 5 AIR VISUALIZATION TEST REPORT (Air Lock wash bay / C0311) AVN-00623 Jan.,2023 Dispensing…
SEDICO UNITS 1-2023
Sr. Doc. Name Doc No. Issue date Project System 1 WB Operation Re-Qualification Protocol& Annex OQP-L-00423 Jan.2023 Disp WB 11605-01 2 PB Operation Re-Qualification Protocol& Annex OQP-L-00523 Jan.2023 CORRIDOR PB 3 LAF Operation Re-Qualification Protocol& Annex OQP-L-00623 Jan.2023 LAF QCR-045 4 PB Operation Re-Qualification Protocol& Annex OQP-L-00723 Jan.2023 CLEAN STORE PB 5 LAF Operation Re-Qualification Protocol& Annex OQP-L-00823 Jan.2023 Pencilin Mobile LAF SP-L1-08 6 LAF Operation Re-Qualification Protocol& Annex OQP-L-00923 Jan.2023 Washing LAF…
Re-Qualification-NHF-KSA-Fume Hood
Sr. Doc. Name Issue date Project System 01 Re-qualification Test Report Jan., 2023 Re-Qualification…
Requalification Test Report-KSA-NPHF-BioSafety
Sr. Doc. Name Issue date Project System 01 Re-qualification Test Report Jan., 2023 Re-Qualification…
Al-Ahly National Bank
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing , Adjusting & Balancing Protcol TAB-00723 Jan.,2023 AHU-03…