Author: Ramy Zyada

Misr Company for Pharmaceuticals

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC Design Qualification Protocol DQP-H-00323 Jan.2023 Sterile, Autoclave, Quality Control, Non-Sterile, Printing, Packaging, weighing & Warehouse…

EGYPHAR-2

S.N Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol & Annex OQP-H-01623 Feb.2023 LIQUID AREA 2 HVAC Operation Re-Qualification Protocol & Annex OQP-H-01723 Feb.2023 SOLID AREA 3 HVAC Operation Re-Qualification Protocol & Annex OQP-H-01823 Feb.2023 WEIGHING AREA 4 Units Operation Re-Qualification Protocol & Annex RQP-L- from (01923 to 03123) Feb.2023 Passboxes & Weighing Boothes…

High Quality

Sr. Doc. Name Doc No. Issue date Project System 1  HVAC Testing, Adjusting & Balancing Report TAB- 02223 Feb.,2023 Air System  2 HVAC Testing, Adjusting & Balancing Report TAB- 02323 Feb.,2023 Water System…

ADCO-Liquid Area

Sr. Doc. Name Doc No. Issue date Project System 1   Compressed Gas System Operation Qualification Report RQP- G -00323 Feb.,2023 Compressed…

SEDICO SEMISOLID

S.N Doc. Name Doc No. Issue date Project System 1 WATER FLOW RATE MEASUREMENTS REPORT WBR-00323 Feb.2023 SEMISOLID AREA 2 HVAC Installation Qualification Protocol & Annex IQP-H-00323 Feb.2023 SEMISOLID AREA 3 HVAC Operation Qualification Protocol & Annex OQP-H-01123 Feb.2023 SEMISOLID AREA 4 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-01223 Feb.2023 SEMISOLID AREA…

Egypt Theater

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC Testing, Adjusting & Balancing Report TAB- 01523 Feb.,2023 AHUs (04A , 04B & 05)…

Egypt Pharma

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC Operation Qualification Protocol OQP-H-04022 April.2022 AHU-01,01’,02,03,04,05,06,07,08,09,09’,10,11 & 11’…

GEMC

Sr. Doc. Name Doc No. Issue date Project System   1 HVAC Testing , Adjusting & Balancing Report TAB-01823 Feb.,2023 AHU-01…