Author: Ramy Zyada

Klybeck-T-Cold Room (VQC/E/158)

Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-175-2025 May.,2025 Cold Room (VQC/E/158) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-T-09625 Apr., 2025 03 PERFORMANCE QUALIFICATION REPORT PQR-T-09725 May., 2025…

UK IMPLANT EGYPT- Q.C., MICRO, PRODUCTION & WAREHOUSE AREAS

Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-10225 May, 2025 Q.C. & Micro Area HVAC Re-Qualification Results Data Sheets RQP-H-10225/01 June., 2025 Q.C. & Micro Area HVAC Re-Qualification Protocol RQP-H-10325 May, 2025 Production Area HVAC Re-Qualification Results Data Sheets RQP-H-10325/01 June., 2025 Production Area HVAC Re-Qualification Protocol RQP-H-10425 May, 2025 Production & Warehouse Area HVAC Re-Qualification Results Data Sheets RQP-H-10425/01 June., 2025 Production & Warehouse Area HVAC Testing, Balancing & Adjusting Protocol TAB-04825 May, 2025 Q.C. &…

JAMJOOM PHARMA-UNITS RE-QUALIFICATION

Note that it’s for (JAMJOOM PHARMA) works in (STRILE AREA) Sr. Doc. Name Doc No. Issue date Project System 01 Pass Boxes Re-Qualification Report RQP-L-13925 May, 2025 STRILE AREA 02 LAFs Re-Qualification Report RQP-L-14625 May, 2025 STRILE AREA…

AL RAZY-COMPRESSED & UNITS

Note that it’s for (AL RAZY PHARMA) works in (production, sampling, micro & weighing  area) Sr. Doc. Name Doc No. Issue date Project System 01 Pass Box Re-Qualification Report RQP-L-14525 Jun., 2025 sampling area 02 weighing booth Re-Qualification Report RQP-L-14425 Jun., 2025 weighing area 03 LAF Re-Qualification Report RQP-L-14025 Jun., 2025 micro area 04 LAF Re-Qualification Report RQP-L-14125 Jun., 2025 sampling area 05 Safety cabinet Re-Qualification Report RQP-L-14225 Jun., 2025 micro area 06 Compressed Air System Re- Qualification Report RQP-G-03825…

AL Amin Medical

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC TESTING, ADJUSTING & BALANCING REPORT TAB-04625 May., 2025 AHU03, AHU04&AHU05…

AL-NASR

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC RE-QUALIFICATION REPORT RQP-H- 10125 June, 2025 (AHU-04, AHU-05&AHU-06) 2 WEIGHING BOOTHS RE-QUALIFICATION REPORT RQP-H- 14325 June, 2025  …

UTOPIA PHARMACEUTICAL-MICROBIOLOGY AREA

Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-09925 May, 2025 Microbiology Area HVAC Re-Qualification Results Data Sheets RQP-H-09925/01 Jun., 2025 Microbiology Area Air Change Verification Test Report ACH-02025 Jun., 2025 Microbiology Area Room Pressure Difference Verification Test Report PDT-01125 Jun., 2025 Microbiology Area Room Temperature and Relative Humidity Test Report TRH-03025 Jun., 2025 Microbiology Area Air Visualization Test Report AVN-01125 Jun., 2025 Microbiology Area Air Borne Particle Count Test Report PCT-05225 Jun., 2025 Microbiology Area Recovery Rate…

Multiacre

Sr. Doc. Name Doc.No Issue date Project system 1 COMPRESSED AIR SYSTEM INSTALLATION QUALIFICATION REPORT IQP-G- 00325 May, 2025 Compressed Air 2     May.2025   3     May.2025   4     May.2025   5     May.2025  …