Al-Andalous- DOP Test

Sr. Doc. Name Doc No. Issue date Project System 1   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04123 March.2023 AHU-02 2   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04223 March.2023 AHU-10 3   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04323 March.2023 Bosch Coating 4   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04423 March.2023 Comasa 50 5   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04523 March.2023 Comasa 200 6   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-04623 March.2023 Sejong Coating 7…

RIVA

S.N Doc. Name Doc No. Issue date Project System 1 HVAC Performance Qualification Protocol & Annex PQP-H-01023 Mar.2023 AHU-09 2 Testing, Adjusting & Balancing Report TAB-01023 Mar.2023 AHU-09 3 Compressed Air Purity Test Report CAQ-01023 Mar.2023 – 4 LAF Performance Qualification Report PQP-L-03523 Mar.2023 AHU-09…

Copad-Units, LAB, Production & Store Area

Sr. Doc. Name Doc No. Issue date Project System 1   Installed HEPA Filter Leak Test Reports From( HLT-02123) TO (HLT-03523) Mar.,2023 LAB , Production , Store Area , LAFs & Pass Boxes 2   Air Change Rate Test Reports From( ACH-00423) TO (ACH-03623) Mar.,2023 LAB , Production & Store Area 3   Air Visualization Test Reports From( AVU-00723) TO (AVU-01123) Mar.,2023 LAFs & Pass Boxes 4   Filter Air Velocity Verification Test Reports From( FVT-00723) TO (FVT-01123) Mar.,2023 LAFs…

Utopia-Units & Micro Area

Sr. Doc. Name Doc No. Issue date Project System 1   LAFs & Pass Boxes Operation Re-Qualification Protocol RQP-L-03423 Mar.,2023 QC-BSC-01 , MB-DPB-04, MB-DPB-05 ,  MB-DPB-02 , QC-LAF-01 , MB-DPB-03 & MB-DPB-01 2   HVAC Operation Re-Qualification Protocol RQP-Q-03922 Mar.,2023 Micro Area…

ENBD Suhag

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC Testing , Adjusting & Balancing Report TAB-02623 Mar.,2023 ((FCU-01,02,03 & 04) , (Fresh Fan 01,02 ) & (Ex.Fan 01 , 02)…

Up Pharma

Sr. Doc. Name Doc No. Issue date Project System 1   Installed HEPA Filter Leak Test Report HLT-03723 Mar.,2023 AHU-04 2   LAFs & Pass Boxes Operation Re-Qualification Report RQP-L-03323 Mar.,2023 Production…

October Pharma

Sr. Doc. Name Doc No. Issue date Project System 1   Installation Qualification Report IQP-H-01023 Mar.,2023 AHU-04 , AHU-05 & AHU-06 2   HVAC Testing , Adjusting & Balancing Report TAB-03723 Mar.,2023 AHU-04 , AHU-05 & AHU-06 3   HVAC Operation Qualification Report OQP-H-03023 Mar.,2023 AHU-04 , AHU-05 & AHU-06…

Visa Project

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC Testing , Adjusting & Balancing Report TAB-04223 Mar.2023 Visa Project…

Atco Pharm

Sr. Doc. Name Doc No. Issue date Project System 1  HVAC Testing , Adjusting & Balancing Report TAB-02823 Mar.2023 Chilled water system…