Sr. Doc. Name Doc No. Issue date Project System HVAC Operation Qualification Report OQP-H-05223 Apr.2023 Syrup Area…
(Jedco)
Sr. Doc. Name Doc No. Issue date Project System Operation Re-Qualification Protocol & Annexes From RQP-H-04723, RQP-H-04923& RQP-H-05023 April,2023 Micro, Sampling& Hard Gelatine Areas Operation Re-Qualification Protocol & Annexes for LAFs (Sampling & Micro Areas) RQP-L-04423 & RQP-L-04323 April, 2023 Sampling LAF & Micro LAF…
safety Science – KSA SLM test report
Document Number SLM-00123 Issue Date 17/05/2023 Report Description Sound level measurements Test Report…
Safety Science Light Measurement test report
Document Number LLM-00123 Issue Date 17/05/2023 Report Description Lighting measurements Test Report…
(October Pharma) RQ
Sr. Doc. Name Doc No. Issue date Project System Operation Re-Qualification Protocol & Annexes From RQP-H-03523 To RQP-H-03823 March, 2023 Micro, Syrup, Packaging, Dispensing & Solid Areas Operation Re-Qualification Protocol & Annexes for LAFs (All Areas & Micro Area) From RQP-L-03623 To RQP-L-03723 March, 2023 Weighing LAF Sampling LAF LAF 2 (Syrup Filling Machine King I) LAF LA3039 (Syrup Automatic Filling Blowing ) LAF Room 25 LAF Room 24 LAF Syrup IMA Automatic filling/LA3039 Operation Re-Qualification Protocol…
Sawad- Golden Chicken factory- TAB (KSA)
Sr. Doc. Name Issue date Doc. No. Project System 01 Testing, Adjusting & Balancing Report (FAHU-01) March, 2023 TAB-01523 Ground Floor 02 Testing, Adjusting & Balancing Report (FAHU-02) March, 2023 TAB-01623 Ground Floor 03 Testing, Adjusting & Balancing Report (FAHU-03) March, 2023 TAB-01723 First Floor 04 Testing, Adjusting & Balancing Report (Exhaust FANS) March, 2023 TAB-01823 Ground Floor& First Floor 05 Testing, Adjusting & Balancing Report (Chilled water) March, 2023 TAB-01923 Ground Floor& First Floor…
Unicare-Riydh Pharma TAB Project
Sr. Doc. Name Doc. No Issue date Project System 1.0 Riyadh Pharma TAB Protocol TAB-00323/00 Mar., 2023 TAB Protocol 1.1 FAHU 1-Annex 1 TAB-00323/01 Mar., 2023 TAB Annex 1.2 AHU 1-Annex 2 TAB-00323/02 Mar., 2023 TAB Annex 1.3 AHU 2-Annex 3 TAB-00323/03 Mar., 2023 TAB Annex 1.4 AHU 3-Annex 4 TAB-00323/04 Mar., 2023 TAB Annex 1.5 AHU 4-Annex 5 TAB-00323/05 Mar., 2023 TAB Annex 1.6 AHU 5-Annex 6 TAB-00323/06 Mar., 2023 TAB Annex 1.7 AHU 6-Annex 7 TAB-00323/07 Mar., 2023…
(Hikma) Works in (Recovery)
Sr. Doc. Name Doc No. Issue date Project System 01 Recovery Test Reports From (RRT-01323 To RRT-09223) From (RTT-09323 To RTT-09423) Apr.2023 AHU-01 ,02,3A,3B,04,05,07,10,11,12&13…
(Al Andalous) (Solid Area )
Sr. Doc. Name Doc No. Issue date Project System Operation Re-Qualification Protocol & Annex for Solid Area OQP-H02123 Jan., 2023 AHUs (04,05,06,15,16,19,20,23,24,25 & 28)…
SEDICO Pass boxes Solid Area
Sr. Doc. Name Doc No. Issue date Project System Operation Re-Qualification Protocol & Annexes for Bass Boxes in Solid Area RQP-L-04523 April, 2023 Pass Box (SD-09) Pass Box (SD-11)…