Author: Ramy Zyada

Saia Pharmaceuticals

Production,Werehouse Doc. Name Doc. No. Area Issue Date Compressed Nitrogen System Operation Re-Qualification Protocol RQP- G -04924 Production,Werehouse Aug- 2024 Compressed Nitrogen System Operation Re-Qualification Protocol RQP- G -04824 Production,Werehouse Aug- 2024…

(Hochster Pharma) _ (micro Area)  

Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Operation Qualification Report RQP-H-10524 July,2024 AHU-20 2 Fume Hood Operation Qualification Report   OQP-L-24124 July,2024 Fuming Hood 3 HVAC Testing, Adjusting & Balancing Report TAB-06824 July,2024 AHU-20 4 HVAC Installation Qualification Report IQP-H-03024 July,2024 AHU-20…

Johnson & Johnson-Micro and sampling

Sr. Doc. Name Doc. No Issue date Project System 01 UNITS Operation Qualification report OQP-L-25124 Aug, 2024 Micro Area 02 LAF Operation Qualification report OQP-L-25224 Aug, 2024 Sampling Area…

CID-Tablet-Units

Sr. Doc. Name Doc. No Issue date Project System 01 Pass Boxes Operation Qualification Report OQP-L-25024 Aug, 2024 Tablet Area…

(Otsuka Ateco)_ (Production Area)  

Sr. Doc. Name Doc No. Issue date Project System 1 Pass Boxes Operation Qualification Protocol   RQP-L-21124 July 2024 Production Area 2 LAFs & Booth Operation Qualification Protocol     RQP-L-21224 July 2024 Production Area…

(MISR PHARMACETICULES)_ (Water Balance)  

Sr. Doc. Name Doc.No Issue date Project system 1 Chiller PERFORMANCE TEST REPORT WPT-01624 Aug., 2024 Chiller (Old-01) 2 Chiller PERFORMANCE TEST REPORT WPT-01524 Aug., 2024 Chiller (Old-02) 3 Chiller PERFORMANCE TEST REPORT WPT-01724 Aug., 2024 Chiller (New-01) 4 PUMP PERFORMANCE TEST REPORT WPT- 01124 Aug., 2024 (Pump-01) 5 PUMP PERFORMANCE TEST REPORT WPT- 01224 Aug., 2024 (Pump-02) 6 PUMP PERFORMANCE TEST REPORT WPT- 01324 Aug., 2024 (Pump-03) 7 WATER FLOW RATE MEASUREMENTS REPORT WBR-01424 Aug., 2024 Valves…

(AL Andalous)_ (Micro Production Area)  

Sr. Doc. Name Doc No. Issue date Project System 1 Hood Operation Re-Qualification Protocol RQP-L-23824 Aug. 2024 Micro Production Area 2 Hood Operation Re-Qualification Protocol RQP-L-24224 Aug. 2024 Micro Production Area 3 Pass Box Operation Re-Qualification Protocol RQP-L-23624 Aug. 2024 Micro Production Area 4 Pass Box Operation Re-Qualification Protocol RQP-L-24324   Aug. 2024 Micro Production Area 5 Pass Box Operation Re-Qualification Protocol RQP-L-24424   Aug. 2024 Micro Production Area 6 Isolator Operation Re-Qualification Protocol RQP-L-23524   Aug. 2024 Micro Production…

(Hochster Pharma)_ (micro Area)  

Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Operation Re-Qualification Protocol RQP-H-10524 July,2024 AHU-20 2 Fuming Hood Operation Re-Qualification Protocol   OQP-L-24124 July,2024 Fuming Hood…