(ME VAC) Works in (BSL3)

Sr. Doc. Name Doc No. Issue date Project System 1.   HVAC Testing, Adjusting & Balancing Protocol TAB-05223 April, 2023 BSL3 (AHUs 1,2,3,4&5) 2.   HVAC Operation Qualification Protocol OQP-H03423 May, 2023 BSL3 (AHUs 1,2,3,4&5) 3.   INSTALLED HEPA FILTER LEAK TEST REPORT HLT-07623 May, 2023 Isolator BIBO 4.   WATER PERFORMANCE TEST REPORT WBR-00523 April, 2023 Water System…

Hikma

Sr. Doc. Name Doc No. Issue date Project System   1 AIR VISUALIZATION TEST REPORT AVU-01723 June, 2023 Filling LAF FZ (EQ-PR-S-FI-03) Cooling LAF (EQ-PR-S-CO-14) Washing LAF (EQ-PR-S-CP-09) Laundry LAF (EQ-PR-S-CP-13) Crimping LAF (EQ-PR-S-CR-12) Filling LAF (EQ-PR-S-FI-11) Preparation LAF (EQ-PR-S-Mfg-10) Mobile LAF (EQ-PR-S-FI-16) UV Pass Box (EQ-PR-S-Mfg-28) CBW LAF (EQ-PR-S-CBW-15)…

EDC

Sr. Doc. Name Doc No. Issue date Project System 1 FCUs AIR FLOW RATE TEST REPORT ACH-05023 July,2023 Restaurant 2 EXF AIR FLOW RATE TEST REPORT ACH-05123 July,2023 Restaurant 3 FAHU AIR FLOW RATE TEST REPORT ACH-05223 July,2023 Restaurant 4 AHU PERFORMANCE MEASUREMENTS REPORT APT-02123 July,2023 Restaurant 5 FAN PERFORMANCE TEST REPORT FPT-00723 July,2023 Restaurant…

(Units) Works in (SEDICO Oncology)

Sr. Doc. Name Doc No. Issue date Project System 01 LAFS Operation Re-Qualification Protocol & Annex RQP-L-06823 June,2023 Oncology Area 02 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-06923 June,2023 Oncology Area 03 TUNNEL Operation Re-Qualification Protocol & Annex RQP-L-07023 June,2023 Oncology Area 04 ISOLATOR Operation Re-Qualification Protocol & Annex RQP-L-07123 June,2023 Oncology Area…

EGYPHAR1 RQ

Sr. Doc. Name Doc No. Issue date Project System 1 LAFS Operation Re-Qualification Protocol & Annex RQP-L-04123 Apr,2023 EGYPHAR 1 2 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-04223 Apr,2023 EGYPHAR 1 3 HVAC Operation Re-Qualification Protocol & Annex RQP-H-05923 Apr,2023 Micro Area…

Jamjoom

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06923 May.,2023 Sterile 2 LAFs Operation Re- Qualification Protocol RQP-L-05523 May.,2023 Sterile 3 Pass Boxes Operation Re-Qualification Protocol RQP-L-05523 May.,2023 Sterile 4 Compressed Gas System Performance Re-Qualification Report RQP-G-01023 May.,2023 Sterile 5 LUX MEASUREMENTS VERIFICATION TEST REPORT LMR-01523 May.,2023 Sterile…

Sedico

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-07823 May.,2023 Soft gelatine 2 HVAC Testing, Adjusting & Balancing Protocol& Annex TAB-06323 May.,2023 Soft gelatine…

Jedco

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex OQP-H-08123 June.,2023 AHUs (F03) Micro Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT OQP-H-08223 June.,2023 AHUs (F01) QC Area 3 Compressed Air System Re-Qualification Protocol RQP-G-01923 June.,2023 compressed…

al andalous

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06223 May. ,2023 AHUs (14&21) Solid Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-06923 May. ,2023 AHUs (2) Semi Solid Area 3 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-07023 May. ,2023 AHUs (10) Semi Solid Area…