Author: Ramy Zyada

(Multicare) Works in (LAFs& Passboxes)

Sr. Doc. Name Doc No. Issue date Project System 1 Sampling Booth Operation Re-Qualification Protocol. (Sampling Area) RQP-L-11023 July,2023 LAFs 2 Weighing Booth Operation Re-Qualification Protocol. (Dispensing Area) RQP-L-11123 July,2023 LAFs 3 Safety Cabinet & LAF Operation Re-Qualification Protocol. (Dispensing Area) RQP-L-11223 July,2023 LAFs 4 Passboxes Operation Re-Qualification Protocol. (Dispensing Area) RQP-L-11323 July,2023 Passboxes…

(AUG) Works in (Sampling, LAfs &Compressed)

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Qualification Protocol RQP-H-07923 July,2023 sampling 2 LAF Operation Re-Qualification Protocol RQP-H-07923 July,2023 Sampling LAFs 3 LAF Operation Re-Qualification Protocol RQP-H-07923 July,2023 Production solid LAFs 4 Compressed Gas System Operation Re-Qualification Protocol RQP-G-01623 July,2023 compressed 5 AIR CHANGE RATE TEST REPORT ACH-04923 July,2023 Room 6 AIR BORNE PARTICLE COUNT TEST REPORT PCR-03723 July,2023 Room…

SACO Medical – KSA- HVAC TAB & Qualification

Sr. Doc. Name Issue date Doc. No. Project System 01 Testing, Adjusting & Balancing Report (Protocol & Annex) July, 2023 TAB-00123 Production Area 02 Testing, Adjusting & Balancing Report (Protocol & Annex) July, 2023 TAB-00223 QC & Micro Lab Area 03 Re-Qualification Report (Protocol & Annex) July, 2023 RQP-H-00523 Production Area 04 Re-Qualification Report (Protocol & Annex) July, 2023 RQP-H-00623 QC & Micro Lab Area 05 Micro LAFs and Pass Box Re-Qualification Report (Protocol & Annex) July, 2023 OQP-L-00123 Micro…

Achievements Scope for medical industries Re-Qualification

Sr. Doc. Name Doc. No Issue date Project System 01 Re-Qualification (Protocol/Annex) for Bio-Safety Cabinet RQP-H–H00723/00 RQP-H–H00723/01 Jun., 2023 Requalification Protocol 02 Re-Qualification (Protocol/Annex) for Bio-Dispensing LAF RQP-H–H00823/00 RQP-H–H00823/01 Jun., 2023 Requalification Protocol 03 Re-Qualification (Protocol/Annex) for Bio- Micro LAF RQP-H–H00923/00 RQP-H–H00923/01 Jun., 2023 Requalification Protocol…

(AMC) Works in (KINGS INTERNATIONAL SCHOOL THE CROWN)

Sr. Doc. Name Doc No. Issue date Project System 1 AHU Performance Measurements Test Report (PU-ELS-01) APT-02223 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 2 FAHU Performance Measurements Test Report (FAHU-ELS-01) APT-02323 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 3 FAN Performance Test Report (EF-ELS-01, EF-ELS-02& EF-ELS-03) FPT-00823 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 4 Air Flow Rate Test Report (PU-ELS-01)) PU-ELS-01 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 5 Air Flow Rate Test Report (FCUs- IU-01, IU-03, IU-05& IU-08) ACH-05423 July,2023 KINGS…

SEDICO -Operation Re-Qualification & Units

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol & Annex RQP-H-08323 July,2023 Solid Area 02 Coating Machine DOP Test Report HLT-07723 July,2023 Solid Area 03 Pass-Boxes Operation Re-Qualification Report RQP-L-10023 July,2023 Solid Area 04 Weighing Booth Operation Re-Qualification Report RQP-L-09923 July,2023 Solid Area 05 LAFS Operation Re-Qualification Protocol & Annex RQP-L-06823 June,2023 Oncology Area 06 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-06923 June,2023 Oncology Area 07 TUNNEL Operation Re-Qualification Protocol & Annex RQP-L-07023…