Author: Ramy Zyada

(EMCO) Works in (Crown British School)

Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Ground Floor) RQP-H-07923 TAB-06923 Ground Floor) 2 Testing, Adjusting & Balancing Protocol& Annex (First Floor) RQP-H-07923 TAB-07023 First Floor 3 Testing, Adjusting & Balancing Protocol& Annex (Second Floor) RQP-H-07923 TAB-07123 Second Floor…

(RIVA PHARMA ) Works in (Production Area)

Sr. Doc. Name Doc No. Issue date Project System 1.   HVAC Operation Re-Qualification Report OQP-H-08423 July.2023 AHU-04,05,06&07 2.   Compressed Gas System Operation Qualification Report OQP-G-02123 July.2023 Production Area 3.   INSTALLED HEPA FILTER LEAK TEST REPORT (Coating ) HLT-11223 June , 2023 Coating Machine 4.   AIR VELOCITY VERIFICATION TEST REPORT FHV-00423 Aug.,2023 Fume Hood 5.   AIR VISUALIZATION TEST REPORT AVFH-00223 Aug.,2023 Fume Hood…

Vaccine Valley

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report & Annex TAB-06823 August, 2023 (Production Building) 02 HVAC Installation Re-Qualification Protocol & Annex IQP-H-01923 August, 2023 (Production Building) 03 HVAC Operation Re-Qualification Protocol & Annex RQP-H-08623 August, 2023 (Production Building)…

Klybeck Life Sciences -KSA-Test Reports

Sr. Doc. Name Issue date Doc. No. Project System 01 Air Change Rate Test Report July, 2023 From (ACH-00123) To (ACH-00623) Animal House Area 02 Installed HEPA Filter Leak Test July, 2023 From (HLT-00123) To (HLT-00623) Animal House Area 03 Vacuum Pressure Test Report July, 2023 From (PDH-00123) To (PDH-00623) Animal House Area 04 Air Visualization Test Report July, 2023 From (AVN-00123) To (AVN-00623) Animal House Area 05 Air Borne Particle Count Test Report July, 2023 From (PCR-00223) To (PCR-00723)…