Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Ground Floor) RQP-H-08923 Aug., 2023 (Ground Floor)…
(Compressed Gas System RQ) In (OTSUKA EGYPT)
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Operation Re-Qualification Protocol & Annex RQP-G-02823 Sep.,2023 360L & 312S areas…
(Misr Pharmaceutical) Works in (Micro Area)
Sr. Doc. Name Doc No. Issue date Project System Testing, Adjusting & Balancing Protocol & Annex TAB-08823 Aug., 2023 Micro Area Performance Qualification Protocol & Annex OQP-H-09523 Aug., 2023 Micro Area…
(ADCO) -Ground Floor
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Protocol & Annex IQP-H-02023 August,2023 AHUs-(01&02&03 ) 02 HVAC Testing, Adjusting & Balancing Protocol & Annex TAB-08523 August,2023 AHUs-(01&02&03 ) 03 HVAC Operation Qualification Protocol & Annex OQP-H-08823 August,2023 AHUs-(01&02&03 )…
(Compressed Gas System Operation Re-Qualification Protocol & Annex) Works in (SEDICO)
Sr. Doc. Name Doc No. Issue date 01 Compressed Gas System Operation Re-Qualification Protocol & Annex (Solid & Liquid Areas) RQP-G-02523 Sep.,2023 02 Compressed Gas System Operation Re-Qualification Protocol & Annex (Sterile & Oral Penicillin Areas) RQP-G-02923 Sep.,2023…
(LAF Operation Re-Qualification Protocol & Annex) Works in (Royal Cosmetic Co.)
Sr. Doc. Name Doc No. Issue date 01 LAF Operation Re-Qualification Protocol & Annex RQP-L-13823 Septemper,2023…
(SAJA PHARMA ) Works in (Production , Dispensing , Micro & Sampling AreaS)
Sr. Doc. Name Doc No. Issue date Project System LAF Operation Re-Qualification Report (WHE-040) RQP-L-13523 Aug.,2023 Dispensing Area LAF Operation Re-Qualification Report (QCE-041) RQP-L-13623 Aug.,2023 Micro Area SAFETY CABINRT Operation Re-Qualification Report (QCE-030) RQP-L-13623 Aug.,2023 – LAF Operation Re-Qualification Report (QCE-101) RQP-L-13423 Aug.,2023 Sampling Area Compressed Nitrogen System Performance Re-Qualification Report RQP-G-02623 Aug.,2023 Production Area Compressed Air System Performance Re-Qualification Report RQP-G-02423 Aug.,2023 Production Area…
(Compressed Gas System Operation Qualification Protocol & Annex) Works in (VACCINE VALLEY)
Sr. Doc. Name Doc No. Issue date 01 Compressed Gas System Operation Qualification Report OQP-G-02723 Septemper,2023…
Biogeneric-BGP-Testing&Balancing
Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Air Side) TAB-08022 July.2023 (Air Side) 2 Testing, Adjusting & Balancing Protocol& Annex (Chilled&Hot Water Side) TAB-08022 July.2024 (Chilled&Hot Water Side)…
Amana- NUPCO Pharmaceutical-KSA-TAB
Sr. Doc. Name Issue date Doc. No. Project System 01 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-D) Aug., 2023 TAB-02123 Ambient Storage 02 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-F) Aug., 2023 TAB-02223 Ambient Storage 03 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-E) Aug., 2023 TAB-02323 Ambient Storage 04 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-A) Aug., 2023 TAB-02423 Ambient Storage 05 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G03) Aug.,…