Sr. Doc. Name Doc. No Issue date Project System 1 IV Area Qualification Protocol & Annex OQP-H-00323 Oct.,2023 Qualification 2 IV Area TAB Protocol & Annex TAB-06223 Oct.,2023 TAB…
(ADCO) Works in (Hazard Materials Warehouse)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Protocol& Annex IQP-H-02223 Nov., 2023 Hazard Materials Warehouse 2 HVAC Testing, Adjusting & Balancing Protocol& Annex TAB10123 Nov., 2023 Hazard Materials Warehouse 3 HVAC Operation Qualification Protocol& Annex OQP-H-11423 Nov., 2023 Hazard Materials Warehouse…
Riyadh Hospital- KSA-Microbiological Safety Cabinet &Dynamic Pass Box Qualification Protocol &Annexes
Sr. Doc. Name Doc. No Issue date Project System 1 Microbiological Safety Cabinet & Dynamic Pass Box Qualification Protocol & Annexes OQP-L-00323 Oct.,2023 Qualification 2 BIO-Safety Cabinet Qualification Protocol & Annex OQP-L-01823 Oct.,2023 Qualification…
Apex Pharma- Test reports (KSA)
Sr. Doc. Name Issue date Doc. No. Project System 01 Filter Air Velocity Verification Test report (Pass box ) Aug., 2023 FVT-00423 Micro Lab Area 02 Installed HEPA Filter Leak Test Report (Pass box) Aug., 2023 HLT-00823 Micro Lab Area 03 Pressure Difference Across HEPA Filters Test Report (Pass box) Aug., 2023 PDH-00423 Micro Lab Area 04 Air Visualization Test Report (Pass box) Aug., 2023 AVU-00123 Micro Lab Area 05 Air Borne Particle Count Test Report (Pass box) Aug., 2023…
Achievements Scope OQ & TAB
Sr. Doc. Name Doc. No Issue date Project System 1.0 Operation Qualification (Production Area) AHU-01 & 02 OQP-H-00423 Oct., 2023 OQ Protocol 1.1 Operation Qualification (Production Area) AHU-01 & 02 OQP-H-00423/01 Oct., 2023 OQ Annex 2.0 Operation Qualification (Micro Lab Area) AHU-01 & 02 OQP-H-00523 Oct., 2023 OQ Protocol 2.1 Operation Qualification (Micro Lab Area) AHU-01 & 02 OQP-H-00523/01 Oct., 2023 OQ Annex 3.0 TAB Protocol (Production Area) AHU-01 & 02 TAB-05123 Oct., 2023 TAB Protocol 3.1 TAB Protocol (Production…
(SEDICO) Works in (ONCOLOGY RQ)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB-09923 Oct, 2023 ONCOLOGY 2 HVAC Operation Re-Qualification Protocol& Annexes RQP-H-11323 Oct., 2023 ONCOLOGY 3 LAFs Operation Re-Qualification Report Protocol& Annexes RQP-L-16523 Oct., 2023 ONCOLOGY 4 Pass Boxes Operation Re-Qualification Report Protocol& Annexes RQP-L-16623 Oct., 2023 ONCOLOGY 5 Tunnel Operation Re-Qualification Report Protocol& Annexe RQP-L-17923 Oct., 2023 ONCOLOGY 6 Isolator Operation Re-Qualification Report Protocol& Annexe RQP-L-18023 Oct., 2023 ONCOLOGY…
(UTOPIA ) Works in (Units )
Sr. Doc. Name Doc No. Issue date Project System LAF & Safety Cabinet Operation Re-Qualification Report RQP-L-14523 Sep.,2023 Micro Area FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-01) FVT-02123 Sep.,2023 Pass box / MB-DPB-01 FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-02) FVT-02223 Sep.,2023 Pass box / MB-DPB-02 FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-03) FVT-02323 Sep.,2023 Pass box / MB-DPB-03 FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-04) FVT-02423 Sep.,2023 Pass box / MB-DPB-04 FILTER AIR…
(Sedico) Works in (Sterile & insulin areas and LAFs)
Sr. Doc. Name Doc No. Issue date Project System Operation Re-Qualification Protocol & Annexes for Insulin Area RQP-H-10223 Sep.,2023 Insulin Area Operation Re-Qualification Protocol & Annexes for Sterile Area RQP-H-09623 Sep.,2023 Sterile Area Operation Re-Qualification Protocol & Annexes for Pass box in insulin Area RQP-L-15823 Sep.,2023 Insulin Area Operation Re-Qualification Protocol & Annexes for Tunnel in Insulin Area RQP-L-15923 Sep.,2023 Insulin Area Operation Re-Qualification Protocol & Annexes for LAFs in Insulin Area RQP-L-15123 Sep.,2023 …
(Misr Company For Pharmaceuticals ) Works in (Micro&Autoclave Area)
Sr. Doc. Name Doc No. Issue date Project System 1 Operation Re-Qualification Protocol & Annexes for LAF RQP-L-17823 Nov.,2023 Autoclave 2 Operation Re-Qualification Protocol & Annexes for LAF RQP-L-15323 Oct.,2023 Sterile Area…
(MEVAC) Works in (B2 Area)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB-09823 Sep., 2023 B2 Area 2 HVAC Operation Qualification Protocol& Annexes OQP-H-10923 Oct., 2023 B2 Area 3 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB10023 Sep., 2023 First Floor 4 HVAC Operation Qualification Protocol& Annexes OQP-H-11323 Oct., 2023 First Floor 5 Turn Over Package TOP-01023 Oct., 2023 B2 Area 6 Air Visualization UDAF Test Reports From AVU-03323 tTo AVU-04123 Oct., 2023 B2 Area…