Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 FAN PERFORMANCE TEST REPORTs FPT-01323 FPT-02123 Dec,2023 GIS Building 02 AIR FLOW RATE TEST REPORT AFR-01623 – Dec,2023 GIS Building 03 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-01923 – Dec,2023 GIS Building…
DAR EL Maamar
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report For (صحة الحيوان) TAB-11023 Des.,2023 صحة الحيوان 02 Room Temperature and Relative Humidity Test Report For (صحة الحيوان) TRH-1623 Des.,2023 صحة الحيوان 03 Air Visualization Test Report For (صحة الحيوان) AVN-07723 Des.,2023 صحة الحيوان…
(Jamjoom) RQ-2023
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13123 Dec.,2023 Sterile Area 2. HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13223 Dec.,2023 Dispensing Area 3. HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13323 Dec.,2023 Solid Area 4. HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13423 Nov.,2023 Micro Area 5. LAFs Operation Qualification Protocol& Annexes RQP-L-22523 Dec.,2023 Sterile Area 6. Pass Boxes Operation Qualification Protocol& Annexes RQP-L-22623 Dec.,2023 Sterile Area 7. LAFs Operation Qualification…
Arabian Gulf Manufacturers for Plastic (KSA)-Enclosure Integrity Test Report
Sr. Doc. Name Issue date Project System 01 Enclosure Integrity Test For Low Electrical Room Level-01 Dec., 2023 Data Center Telco Park Of Neom 02 Enclosure Integrity Test For Soc Viewing Room Level-01 Dec., 2023 Data Center Telco Park Of Neom…
(ADCO) Works in (RIVO)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC As-Found Measurements Protocol& Annexes TAB-10923 Dec.,2023 RIVO…
Sharm Pharma (Ground&2nd floor)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Protocol & Annexes for Ground Floor IQP-H-02623 Dec.,2023 Ground Floor 2 HVAC Installation Qualification Protocol & Annexes for Second Floor IQP-H-02723 Dec.,2023 Second Floor…
(WB Operation Re-Qualification) For LAF Works in (Johnson & Johnson)
Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Operation Re-Qualification Protocol & Annex RQP-L-24123 Dec,2023 Weighing Area…
(APEX) Works
Sr. Doc. Name Doc No. Issue date Project System 1 Compressed Nitrogen System Operation Qualification Protocol& Annexes RQP-G-03323 Nov.,2023 Compressed 2 LAF Operation Re-Qualification Protocol& Annexes RQP-L-191-23 Nov.,2023 Micro Lab 3 Safety Cabinet Operation Re-Qualification Protocol& Annexes RQP-L-19223 Nov.,2023 Micro Lab 4 Weighing Booth Operation Re-Qualification Protocol& Annexes RQP-L-19323 Nov.,2023 Sampling Room 5 INSTALLED HEPA FILTER LEAK TEST REPORTs HLT-15323 : HLT-15923 Nov.,2023 Sampling Area…
(Testing, Adjusting & Balancing) Works in (NOVARTIS)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Protocol & Annex TAB-10823 Dec,2023 Store Area…
(INSTALLED HEPA FILTER LEAK TEST) Works in (MEMPHIS)
Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 INSTALLED HEPA FILTER LEAK TEST REPORTs HLT-16423 HLT-17323 Dec,2023 Micro, Ointments, Solid and Syrup Areas…