Sr. Doc. Name Doc No. Issue date Project System 1 HVAC As Found Measurements Report TAB-10623 Nov.,2023 Effervescent Area 2 Design Package TOP-01123 Nov.,2023 Effervescent Area 3 HVAC As Found Measurements Report TAB-10623 Nov.,2023 Solid Area 4 Design Package TOP-01223 Nov.,2023 Solid Area…
(Biogeneric Pharma) Works in LAFs , Bass Pox and Rooms in (Production&Micro Areas)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Qualification Protocol & Annexes LAFs OQP-H-24423 Dec.,2023 Production Area 2 HVAC Operation Qualification Protocol & Annexes Pass Box OQP-H-24523 Dec.,2023 Production Area 3 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-07823 Dec.,2023 Production Area 4 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-07923 Dec.,2023 Production Area 5 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-08023 Dec.,2023 Production Area 6 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-08123 Dec.,2023 Production Area 7 AIR…
(Compressed Gas System Operation Re-Qualification) For Production Area in (Otsuka Egypt)
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Operation Re-Qualification Protocol & Annex OQP-G-03823 Dec,2023 360L & 312S areas…
(TEST REPORTS) Works in (EL KAHIRA PHARM)
Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 AIR CHANGE ADJUSTMENT TEST REPORT ACH-06323 ACH-06623 Dec,2023 Liquid Sterile 02 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-02023 PDT-02323 Dec,2023 Liquid Sterile 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-01723 TRH-01923 Dec,2023 Liquid Sterile 04 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-17723 HLT-17923 Dec,2023 Liquid Sterile 05 AIR VISUALIZATION TEST REPORT (NUDAF) AVN-08323 AVN-08523 Dec,2023 Liquid Sterile 06 AIR BORNE PARTICLE COUNT TEST REPORT PCR-04723 PCR-04923…
SHAR (KSA)-Enclosure Integrity Test Report
Sr. Doc. Name Issue date Project System 01 Enclosure Integrity Test for Electrical Room Building-01 Dec., 2023 Neom Port Temporary Facilities 02 Enclosure Integrity Test for Electrical Room Building-02 Dec., 2023 Neom Port Temporary Facilities 03 Enclosure Integrity Test for Telecom Room – Building 01 Dec., 2023 Neom Port Temporary Facilities 04 Enclosure Integrity Test for Telecom Room – Building 02 Dec., 2023 Neom Port Temporary Facilities 05 Enclosure Integrity Test for It Room – Building 01 Dec., 2023 Neom…
(Sanofi)
Sr. Doc. Name Doc No. Issue date Project System HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11223 Dec.,2023 AHU-09 HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11323 Dec.,2023 AHU-12 HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11423 Dec.,2023 AHU-14 HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11523 Dec.,2023 AHU-ZMSA HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11623 Dec.,2023 AHU-ZMDI HVAC Testing, Adjusting &…
AL-ROWAD
Sr. Doc. Name Doc No. Issue date Project System 01 Operation Qualification Report OQP-H-14223 Dec,2023 Production, Dispensing, and Sampling Areas 02 Installation Qualification Report IQP-H-02923 Dec,2023 Production, Dispensing, and Sampling Areas 03 Testing, Adjusting, and Balancing Report TAB-11123 Dec,2023 Production, Dispensing, and Sampling Areas…
(HVAC Qualification) Works in (KAHIRA PHARM-Proximol Area.)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Protocol & Annex IQP-H-02323 Nov,2023 Proximol Area 02 HVAC Operation Qualification Protocol & Annex OQP-H-13623 Nov,2023 Proximol Area 03 HVAC Performance Qualification Protocol & Annex (Revision 01) PQP-H-00923 Nov,2023 Proximol Area 04 HVAC Performance Qualification Protocol & Annex (Revision 02) PQP-H-01023 Nov,2023 Proximol Area…
(Dar Al Orouba) Works in ( Ground ,First , second , third , fourth & fifth Floors)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Protocol & Annexes for Ground Floor TAB-11223 Dec.,2023 Ground ,First , second , third , fourth & fifth Floors…
(Passbox Operation Re-Qualification) For Passbox in (FIRMA CORP)
Sr. Doc. Name Doc No. Issue date Project System 01 Passbox Operation Re-Qualification Protocol & Annex RQP-L-24223 Dec,2023 Aerosol Department…