Sr. Doc. Name Doc. No Issue date Project System 01 HVAC operation Re-Qualification Reports for AHU-08 RQP-H-02624 Sep.,2024 Sterile Production Area 02 HVAC operation Re-Qualification Reports for AHU-09 RQP-H-02724 Sep.,2024 Sterile Production Area 03 HVAC operation Re-Qualification Reports for AHU-16 RQP-H-02824 Sep.,2024 Sterile Micro Lab Area…
National Pharmaceutical Factory Co. – Units Re-Qualification (Sampling & Dispensing Area)
Sr. Doc. Name Doc. No Issue date Project System 01 Sampling Booth Operation Re-Qualification Reports RQP-L-05124 Sep.,2024 Sampling Area 02 Dispensing Booth Operation Re-Qualification Reports RQP-L-05224 Sep.,2024 Dispensing Area…
BATTERJEE PHARMA-KSA-SOLID AREA
Doc. Name Doc. No. Issue Date Area Installed HEPA FILTER LEAK Test Report HLT-03324 Aug.,2024 SOLID AREA…
(Otsuka Ateco)_ (Solid area)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Report RQP-H-12424 Sep., 2024 Large Volume Parenteral Line area…
(Semco Monorail Platform 22)
Sr. Doc. Name Doc. No. Issue date Project System 1 SMOKE FAN TESTING, ADJUSTING & BALANCING REPORT FPT-12724 Sep.,2024 SMOKE FAN (NC22-SM.F-RF-01)…
WNB-Syringe Filling
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC operation Re-Qualification Reports RQP-H-12024 Sep.,2024 Syring Filling…
WNB-Syringe Filling
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC operation Re-Qualification Reports RQP-H-12024 Sep.,2024 Syring Filling…
WNB-Syring Filling
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC operation Re-Qualification Reports RQP-H-12024 Sep.,2024 Syring Filling…
مصلحة ضرائب كبار الممولين
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Protocol TAB-18124 Jul.,2024 Chilled Water System…
مصلحة ضرائب كبار الممولين
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Protocol TAB-18124 Jul.,2024 Chilled Water System…