Doc. Name Doc. No. Issue Date Area HVAC OPERATION RE-QUALIFICATION PROTOCOL RQP-H-14524 Oct.,2024 STERILE AREA HVAC OPERATION RE-QUALIFICATION REPORT RQP-H-14524/01 Oct.,2024 STERILE AREA HVAC OPERATION RE-QUALIFICATION REPORT RQP-H-14524/02 Oct.,2024 STERILE AREA HVAC OPERATION RE-QUALIFICATION REPORT RQP-H-14524/03 Oct.,2024 STERILE AREA HVAC OPERATION RE-QUALIFICATION REPORT RQP-H-14524/04 Oct.,2024 STERILE AREA…
(KAHIRA PHARMACUTICAL)_ (Compressed Gas)
Sr. Doc. Name Doc.No Issue date Project system 1 Compressed Gas System Performance Qualification Report OQP-G-06524 Oct.,2024 Strile Area 2 Compressed Air System Performance Qualification Report OQP-G-06624 Oct.,2024 Proximol Area 3 Compressed Air System Performance Qualification Report OQP-G-06724 Oct.,2024 Anesthesia Area 4 Compressed Air System Performance Qualification Report OQP-G-06824 Oct.,2024 Mouth Wash Area 5 Compressed Air System Performance Qualification Report OQP-G-06924 Oct.,2024 Sachet Filling Area 6 Compressed Air System Performance Qualification Report OQP-G-07024 Oct.,2024 Drops Area 7 Compressed Air System…
(GYPTO PHARMA)_ (Solid Extension Area)
Sr. Doc. Name Doc.No Issue date Project system 1 DUCT TRAVERSE TEST REPORT DRT-00824 Oct.,2024 AHU-11-01 2 DUCT TRAVERSE TEST REPORT DRT-00924 Oct.,2024 AHU-11-02 3 DUCT TRAVERSE TEST REPORT DRT-01024 Oct.,2024 AHU-11-03 4 DUCT TRAVERSE TEST REPORT DRT-01124 Oct.,2024 AHU-11-04 5 DUCT TRAVERSE TEST REPORT DRT-01224 Oct.,2024 AHU-11-05…
OTSUGA EGYPT – GF LVP 1
Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting and Balancing Operation Qualification Reports TAB-08624 Oct., 2024 GF LVP 1…
Nerhadou-Phase I & Phase II
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Design Qualification Protocol DQP-H-00724 Jul.,2024 Phase II 02 HVAC Design Qualification Protocol DQP-H-00824 Jul.,2024 Phase I…
KAHIRA PHARMACUTICAL- Urisept Area
Sr. Doc. Name Doc. No. Issue date Project System 1 Compressed Air System Operation Qualification Report OQP-G-06424 Oct.,2024 Urisept Area…
(GYPTO PHARMA)_ (Solid Extension Area)
Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Operation Qualification Report OQP-H-14424 Oct., 2024 AHU-05…
Alpha Pharma-PMO-Turn Over Package
…
Otsuka Egypt – IQ, TAB, OQ, Compressed
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC Installation Qualification Reports IQP-H-03924 Sep., 2024 GF LVP (1) 02 HVAC Operation Qualification Reports OQP-H-14324 Sep., 2024 GF LVP (1) 03 Compressed Air Operation Qualification Reports OQP-G-06224 Sep., 2024 Production Area 04 PRE-TAB REVIEW & TAB FUNCTIONAL Reports TAB-08624 Sep., 2024 GF LVP (1)…
MED Pharma
Sampling Area Doc. Name Doc. No. Area Issue Date HVAC DESIGN QUALIFICATION PROTOCOL DQP-H- 01424/01 Sampling Area Sep.,2024 HVAC INSTALLATION QUALIFICATION PROTOCOL IQP-H-00924 Sampling Area Sep.,2024 HVAC OPERATION QUALIFICATION PROTOCOL OQP-H-03824 Sampling Area Sep.,2024 HVAC PERFORMANCE QUALIFICATION PROTOCOL PQP-H-00224 Sampling Area Oct.,2024…