Author: Ramy Zyada

IEC

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB- 00124 13/2/2024 Ground Floor…

(Sedico Oncology) Works in Dop Operation Qualification Test Report in (Oncology)

Sr. Doc. Name Doc No. Issue date Project System 1 Installed HEPA Filter Leak Test Report HLT-02124 Feb .,2024 Oncology 2 Installed HEPA Filter Leak Test Report HLT-02224 Feb .,2024 Oncology 3 Installed HEPA Filter Leak Test Report HLT-02324 Feb .,2024 Oncology 4 Installed HEPA Filter Leak Test Report HLT-02424 Feb .,2024 Oncology 5 Installed HEPA Filter Leak Test Report HLT-02524 Feb .,2024 Oncology…

(Al Andalus) Works in Bio safety cabinet & Waste Air Lock Operation Qualification Report in (Micro Biological & Solid Area)

Sr. Doc. Name Doc No. Issue date Project System 1 Biosafety cabinet Operation Qualification Protocol & Annexes OQP-L-01924 Jan .,2024 Micro Biological Area 2 Air Change Rate Test Report ACH-01224 Jan .,2024 Solid Area 3 Room Pressure Difference Test Report PDT-00924 Jan .,2024 Solid Area 4 Air Visualization Test Report AVN-01824 Jan .,2024 Solid Area 5 Air Borne Particle Count Test Report PCR-00924 Jan .,2024 Solid Area…

(APEX Pharma)

Sr. Doc. Name Doc No. Issue date Project System 01 AIR SHOWER Operation Qualification Protocol OQP-L-02324 8/2/2024 production 02 AIR VELOCITY VERIFICATION TEST REPORT FVT-00624 8/2/2024 micro 03 AIR VISUALIZATION TEST REPORT AVU-00924 8/2/2024 micro 04 AIR VISUALIZATION TEST REPORT AVU-00824 8/2/2024 micro 05 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-02024 8/2/2024 production 06 PASS BOX Operation Qualification Protocol OQP-L-02424 8/2/2024 production 07 AIR VELOCITY VERIFICATION TEST REPORT FVT-00224 8/2/2024 Lab Area 08 AIR VISUALIZATION TEST REPORT AVU-00224 8/2/2024 Lab…

Feb.2024 Pass Box & Qualification Project of SPPF-KSA

Doc. Name Doc. No. Issue Date Area (Dynamic Pass Box-Corridor / APD-049) Report RQP-L-00124 Feb.2024 Sterile Department (Dynamic Pass Box-Solid / APD-044) Report RQP-L-00224 Feb.2024 Production Department (Sampling Pass Box/AQC-063) Report RQP-L-00324 Feb.2024 Qc Sampling Department (Dynamic Pass Box Liquid/ADP-047) Report RQP-L-00424 Feb.2024 Production Department (Dynamic Pass Box Tunnel/APD-050) Report RQP-L-00524 Feb.2024 Production Department (Dynamic Pass Box-Sterile Packaging/APD-048) Report RQP-L-00624 Feb.2024 Production Department (Dynamic Pass Box/AWH-001) Report RQP-L-00724 Feb.2024 Warehouse Department (Dynamic Pass Box/AWH-002) Report RQP-L-00824 Feb.2024 Warehouse Department (Micro-Non…

(ATECO)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Reports RQP-H-01124 8/2/2024 Phase 1 02 LAF Operation Qualification Reports OQP-L-02724 8/2/2024 Micro Area…