Author: Ramy Zyada

(Biogeneric) Vaccine area

Sr. Doc. Name Doc No. Issue date Project System 1.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-34) PDT-01124 Feb.,2024 Vaccine Area 2.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-35) PDT-01224 Feb.,2024 Vaccine Area 3.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-36) PDT-01324 Feb.,2024 Vaccine Area 4.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-37) PDT-01424 Feb.,2024 Vaccine Area 5.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-38) PDT-01524 Feb.,2024 Vaccine Area 6.   ROOM PRESSURE DIFFERENCE TEST REPORT (AHU-39) PDT-01624 Feb.,2024 Vaccine…

ADCO-Hazard Material Room

Sr. Doc. Name Doc. No. Issue Date Project System 1 HVAC Installation Qualification Report IQP-H-02223 Nov.,2023 Hazard Material Room 2 Testing, Adjusting & Balancing Report TAB10123 Nov.,2023 Hazard Material Room 3 HVAC Operation Qualification Report OQP-H-11423 Feb.,2024 Hazard Material Room…

(PHILO) works in (HVAC operation re Qualification)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol RQP-H-01824 26/2/2024 HVAC 02 HVAC Operation Re-Qualification Annex RQP-H-01824 26/2/2024 HVAC 03 Installed heap filter leak test report HLT-02624 26/2/2024 HVAC 04 Installed heap filter leak test report HLT-02724 26/2/2024 HVAC…

(MEVAC) works in (Sampling, Oil Tank & Live Vaccine Filling Area)

Sr. Doc. Name Doc No. Issue date Project System 01   Air Visualization Test Report AVN-00824 25/2/2024 Sampling Area 02 Air Visualization Test Report AVU-00424 25/2/2024 Live Vaccine Filling Area 03 Air Visualization Test Report AVU-00524 25/2/2024 Sampling Area 04 Air Visualization Test Report AVU-00624 25/2/2024 Sampling Area 05 Air Visualization Test Report AVU-00724 25/2/2024 Live Vaccine Filling Area 06 Air Visualization Test Report AVN-00924 25/2/2024 Sampling Area 07 Air Visualization Test Report AVN-01024 25/2/2024 Oil Tank Area 08 Air…

CIRA PHARMA

Sr. Doc. Name Doc No. Issue date Project System 1  HVAC Operation Qualification Protocol OQP-H-01623 Feb.,2024 Cream Filling, Cream Preparation & LABs Areas   2   Compressed Gas System Operation Qualification Protocol OQP-G-01324 Feb.,2024 Cream Filling, Cream Preparation & LABs Areas   3  HVAC Installation Qualification Protocol IQP-H-02423 Nov.,2023 Cream Filling, Cream Preparation & LABs Areas  …

(SEDICO) works in (Package Area)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB-01024 14/2/2024 Package Area 02 Operation Qualification Protocol &Annex OQP-L-01024 14/2/2024 Package Area…