Water Side Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Protocol TAB-20021 Aug, 2020 TAB / LEEDS Chilled Water System 02 TAB Report – Annex-01 TAB-20021 Aug, 2020 TAB / LEEDS Chilled Water System Air Side Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol. TAB-16520 Aug, 2020 TAB /Ground Floor 02 TAB Report -Annex-01 TAB-16520/01 Aug, 2020 TAB /Ground Floor 03 TAB Report -Annex-02 TAB-16520/02 Aug, 2020 TAB…
SEMCO _ TAB &Qualifications
Sr. Doc. Name Issue date Project System 01 Testing, Adjusting & Balancing Report For Warehouse – Air Side In Care Inspection building Sep. 2020 HVAC TAB Qualifications…
Saja Pharmaceutical _ Qualification
Sr. Doc. Name Issue date Project System 01 OQ Works Sep.,2020 (Production Area) 02 OQ Works Sep.,2020 (Microbiology Area) 03 OQ Works Sep.,2020 (Sampling & Dispensing Areas)…
SEDICO _ LAF Qualifications
Sr. Doc. Name Issue date Project System 01 LAF Qualifications Sep.,2020 LAFs…
MAST PLAST CO._HVAC TAB & Qualification Quotation
Sr. Doc. Name Issue date Project System 01 TAB Works Sep.,2020 (AHU-01) 02 OQ Works Sep.,2020 (AHU-01)…
EUROPEAN EGYPTIAN PHARMACEUTICAL INDUSTRY _ Compressed Air
Sr. Doc. Name Issue date Project Area 01 Compressed Air & Nitrogen Gas Quality Performance Qualification Protocol Aug., 2020 PRODUCTION &Quality Control DEPARTMENT 02 Compressed Air & Nitrogen Gas Quality Performance Qualification Test Results Aug., 2020 PRODUCTION &Quality Control DEPARTMENT…
Otsuka Egypt_ Compressed Air
Sr. Doc. Name Issue date Project System 01 Compressed air Aug. 2020 Ampoule Area 02 Compressed N2 large volume line2 03 Compressed CO2…
Vitabiotic – Test, Balance & Qualification
Sr. Doc. Name Issue date Project System 01 TESTING, ADJUSTING & BALANCING protocol &Annex July,2020 WAREHOUSE 02 TESTING, ADJUSTING & BALANCING protocol &Annex Aug. 2020 Microbiology 03 Operation Qualification protocol &Annex…
Semco-ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT
Sr. Doc. Name Doc. No Issue date Project System 01 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00220 Jan,2020 Block B – First Floor 02 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00120 Jan,2020 Block B – Ground Floor 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00320 Jan,2020 Block F…
Egyptian Porcelain _ Balancing Valves Works
Sr. Doc. Name Issue date Project System 01 TAB Works (water Balance B.V) Aug.,2020 (First Floor)…