Author: Ramy Zyada

October Pharma

Sr. Doc. Name Doc No. Issue date Project System 1 AIR CHANGE RATE TEST REPORT ACH- 01025 Apr., 2025 Apex Oven Technical Room / 69A IN AHU-C04 2 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-01025 Apr., 2025 3 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH- 01725 Apr., 2025 4 AIR VISUALIZATION TEST REPORT AVN- 00825 Apr., 2025 5 AIR BORNE PARTICLE COUNT TEST REPORT PCR- 01225 Apr., 2025 6 RECOVERY RATE TEST REPORT RRT- 00125 Apr., 2025…

SANOFI

Ampoule Sterile Area Doc. Name Area Doc. No. Issue Date AIR CHANGE RATE TEST REPORT Ampoule Sterile Area ACH-00925 Apr., 2025 ROOM PRESSURE DIFFERENCE TEST REPORT Ampoule Sterile Area PDT-00925 Apr., 2025…

MEVAC

B-2 (Ground Floor & First Floor) Doc. Name Area Doc. No. Issue Date HVAC TESTING, ADJUSTING & BALANCING PROTOCOL Ground Floor TAB-01825 Apr., 2025 HVAC TESTING, ADJUSTING & BALANCING PROTOCOL First Floor TAB-01925 Apr., 2025 HVAC OPERATION QUALIFICATION PROTOCOL Ground Floor OQP-H- 05325 Apr., 2025 HVAC OPERATION QUALIFICATION PROTOCOL First Floor OQP-H- 05425 Apr., 2025…

KLYBECK-KSA-LIVE FILLING AREA

Doc. Name Doc. No. Issue Date Area Units Re-Qualification Protocol RQP-L-05125 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report RQP-L-05125/01 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report     RQP-L-05125/02 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report RQP-L-05125/03 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report RQP-L-05125/04 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report RQP-L-05125/05 Apr.,2025 Live Filling Area Dynamic Pass Box Re-Qualification Report RQP-L-05125/06 Apr.,2025 Live Filling Area Ceiling Suspended LAF Box…