Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-20820 Sep, 2020 HVAC TAB (Faculty of Medicine) 02 TAB Report -Annex-01.01 TAB-20820/1 Sep, 2020 HVAC TAB (Faculty of Medicine) 03 TAB Report -Annex-01.02 TAB-20820/2 Sep, 2020 HVAC TAB (Faculty of Medicine)…
Gypto (Uccma) _ TAB, DQ, IQ & OQ
Sr. Doc. Name Doc No. Issue date Project System 01 TAB TAB-00220 Jule,2020 Zone 8 02 DQ DQP-H-00120 Jule,2020 Zone 8 03 IQ IQP-H-00220 Jule,2020 Zone 8 04 OQ OQP-H-00220 Jule,2020 Zone 8…
Gypto (Uccma) _ TAB, DQ, IQ & OQ
Sr. Doc. Name Doc No. Issue date Project System 01 TAB TAB-00420 Jule,2020 Dispensing (DP1) 02 DQ DQP-H-00320 Jule,2020 Dispensing (DP1) 03 IQ IQP-H-00420 Jule,2020 Dispensing (DP1) 04 OQ OQP-H-00420 Jule,2020 Dispensing (DP1)…
October Pharma – Qualification & lAF Quotation (Room 36)
Sr. Doc. Name Issue date Project System 01 LAF Qualification Aug.,2020 Syrup Area 02 Operation Qualification Room 37 & Room 36 Aug.,2020 Syrup Area 03 Operation Qualification Data Sheets Room 36 Aug.,2020 Syrup Area…
El Razy Pharma – TAB
Ground Floor Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-21020 Sep, 2020 TAB / Ground Floor 02 TAB Report -Annex-01.01 TAB-21020/01 Sep, 2020 TAB / Ground Floor 03 TAB Report -Annex-01.02 TAB-21020/02 Sep, 2020 TAB / Ground Floor First Floor Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-21120 Sep, 2020 TAB / First Floor 02 TAB Report -Annex-01.01 TAB-21120/01 Sep, 2020 TAB / First Floor 03…
Gost _ Pass Box
Sr. Doc. Name Issue date Project System 01 Air Velocity June 2020 Pass Box 02 HEPA Filter Leak…
ADWIA Mirage – Compressed Gas
Sr. Doc. Name Issue date Project Area 01 Compressed Gas System Installation Qualification Protocol Aug., 2020 Mirage Building 02 Annex-01.01Compressed Gas System Installation Qualification Protocol Aug., 2020 Mirage Building 03 Compressed Gas System Operation Qualification Protocol Aug., 2020 Mirage Building 04 Annex-01 .01Compressed Gas System Operation Qualification Protocol Aug., 2020 Mirage Building…
Liptis (Warehouse) -Qualification
Sr. Doc. Name Issue date Project Area 01 HVAC Operation Qualification Protocol vol 1 Aug.,2020 Warehouse Area 02 HVAC Operation Qualification Protocol vol 2 Aug.,2020 Warehouse Area 03 HVAC Operation Qualification Protocol vol 3 Aug.,2020 Warehouse Area 04 HVAC Operation Qualification Protocol vol 1 Aug.,2020 Processing Area 05 HVAC Operation Qualification Protocol vol 2 Aug.,2020 Processing Area 06 HVAC Operation Qualification Protocol vol 3 Aug.,2020 Processing Area…
Rofayda Hospital _ HEPA FILTER LEAK TEST
Sr. Doc. Name Issue date System name 01 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-01 02 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-01 03 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-01 04 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-01 05 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-02 06 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-02 07 INSTALLED HEPA FILTER LEAK TEST REPORT Sep., 2020 AHU-02 08 INSTALLED HEPA…
Otsuka Egypt _ Compressed
Sr. Doc. Name Issue date Project System 01 Compressed air June. 2020 large volume line1 02 Compressed N2 03 Compressed CO2…