JEDCO International Pharmaceuticals Co. – Re-Qualification & INSTALLED HEPA FILTER LEAK TEST

Sr. Doc. Name Issue date Project System 01 LAF Re-Qualification Protocol & Annex Jan., 2021 LAB Area 02 Weighing booth Re-Qualification Protocol & Annex Jan., 2021 Dispensing Area 03 AHU (TANTA)Test Report (INSTALLED HEPA FILTER LEAK TEST) Jan., 2021 Solid Area 04 AHU -13  Test Report (INSTALLED HEPA FILTER LEAK TEST) Jan., 2021 Solid Area 05 AHU (TANTA)Test Report (INSTALLED HEPA FILTER LEAK TEST) Jan., 2021 Solid Area 06 AHU -02 Test Report (INSTALLED HEPA FILTER LEAK TEST) Jan., 2021…

Unitech (Basement)-TAB

Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 of 02 TAB-14421 Oct, 2020 TAB /B1 02 TAB Report -Annex-01.01 TAB-14421/01 Oct, 2020 TAB /B1 03 TAB Report -Annex-01.02 TAB-14421/02 Oct, 2020 TAB /B1 01 TAB Report – Vol.02 of 02 TAB-14521 Oct, 2020 TAB /B2 02 TAB Report -Annex-02.01 TAB-14521/01 Oct, 2020 TAB /B2 03 TAB Report -Annex-02.02 TAB-14521/02 Oct, 2020 TAB /B2…

Al-Andalous- Air change & Particle count Test Report

Sr. Doc. Name Doc No. Issue date Project System 01 Air Change Rate Test TEST REPORT   ACH-00621 April.,2021 Solid Area(AHU-05) – Ground Floor 02 Air Change Rate Test TEST REPORT ACH-00721 April.,2021 Solid Area(AHU-06) – Ground Floor 03 Air Change Rate Test TEST REPORT ACH-00821 April.,2021 Solid Area(AHU-14) – Ground Floor 04 Air Change Rate Test TEST REPORT ACH-00921 April.,2021 Solid Area(AHU-28) – Ground Floor 05 Air Borne Particle Count Test TEST REPORT PCR-02421 April.,2021 Solid Area(AHU-05) – Ground…

GYPTO PHARMA – Design Qualification

Sr. Doc. Name Doc. No Issue date Project System 01 Design Qualification (Protocol & Annex) DQP-H-00121 Jun., 2020 Sampling Area 02 Design Qualification (Protocol & Annex) DQP-H-00221 Jun., 2020 Zone 8 03 Design Qualification (Protocol & Annex) DQP-H-00321 Jun., 2020 Zone 10 04 Design Qualification (Protocol & Annex) DQP-H-00421 Jun., 2020 Zone 18 05 Design Qualification (Protocol & Annex) DQP-H-00521 Jun., 2020 Micro Area 06 Design Qualification (Protocol & Annex) DQP-H-00721 Jun., 2020 DP1 Area 07 Design Qualification (Protocol &…

Hikma-Tunnel

Sr. Doc. Name Doc No. Issue date Project System 01 Filter Air Velocity Verification FVT-03221 March 2021 Test Report 02 Installed HEPA Filter Leak HLT-11721 March 2021 Test Report 03 Pressure Difference Across HEPA Filters PDH-03321 March 2021 Test Report 04 Air Borne Particle Count PCR-02321 March 2021 Test Report…

El-Razy Pharma- Compressed Air & LAFs Qualification

Sr. Doc. Name Issue date Project System 01 Compressed Air (G-051) Test Reports (Water Content Test & Oil Content Test & Solid Particulate Content Test) Feb., 2021 Production Area 02 Compressed Air (G-015) Test Reports (Water Content Test & Oil Content Test & Solid Particulate Content Test) Feb., 2021 Production Area 03 Dynamic Passbox/(SC-EQ-008)Test Reports (Filter  Air velocity verification test & Installed HEPA filter leak test & Pressure difference across HEPA filter test& Air visualization test  & Air borne particle…

Al-Amin – TAB

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report (Protocol & Annexes)   TAB-13121 Mar.,2021 AHU-05…

JEDCO (Semi-Solid (AHU-07 & 08))-HVAC TAB, IQ & OQ

Sr. Doc. Name Doc. No Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report (Protocol & Annex) TAB-13221 April, 2021 HVAC TAB for Semi Solid (AHU 07 & 08) 02 HVAC Installation Qualification Report (Protocol & Annex) IQP-H-00621 April, 2021 HVAC Installation Qualification for Semi Solid (AHU 07 & 08) 03 HVAC Operation Qualification Report (Protocol & Annex) OQP-H-03221 April, 2021 HVAC Operation Qualification for Semi Solid (AHU 07 & 08)…

Marcyrl- Re-Qualification

Sr. Doc. Name Issue date System Name 01 HVAC Re-Qualification Aug.,2020 AHU-07 02 HVAC Re-Qualification Aug.,2020 AHU-08 03 HVAC Re-Qualification Aug.,2020 AHU-09 04 HVAC Re-Qualification Aug.,2020 AHU-10 05 HVAC Re-Qualification Aug.,2020 AHU-11…