Sr. Doc. Name Doc No. Issue date Project System 01 ABSOLUTE HEPA FILTER LEAK TEST REPORT HLT-12721 May.,2021 COATING MACHINE…
EGYPHAR-Test report
Sr. Doc. Name Doc No. Issue date Project System 01 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT HLT-00420 Jun.,2020 Solid 1 Area 02 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT HLT-00520 Jun.,2020 Solid 2 Area 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT HLT-00620 Jun.,2020 Sampling Area 04 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT HLT-00720 Jun.,2020 Dispensing Area 05 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT HLT-00820 Jun.,2020 Liquid Area…
TAISIER MED_Re-Qualification
Sr. Doc. Name Doc No. Issue date Project System 01 Re-Qualification Protocol OQP-H-03921 May., 2021 Production Area 02 HVAC Re-Qualification Protocol Annex-01.01 OQP-H-03921/01 May., 2021 Production Area 03 HVAC Re-Qualification Protocol Annex-01.02 OQP-H-03921/02 May., 2021 Production Area 04 FILTER AIR VELOCITY VERIFICATION TEST REPORT FVT-03721 May., 2021 LAB Area 05 AIR BORNE PARTICLE COUNT TEST REPORT PCR-03621 May., 2021 LAB Area …
HI PHARM – Units Qualification
Sr. Doc. Name Doc No. Issue date Project System 01 Units Qualification (Protocol &annexes) OQP-L-03221 May,2021 Hormone, Non-Hormone &Micro Area…
Uccma (Feed Factory)- LAF & SAFETY CABINET
Sr. Doc. Name Issue date Project System 01 SAFETY CABINET /657 Test Reports (Filter Air velocity verification test & Installed HEPA filter leak test & Pressure difference across HEPA filter test& Air visualization test & Air borne particle count test & Recovery time test) March, 2021 LAB 1 Area 02 SAFETY CABINET /658 Test Reports (Filter Air velocity verification test & Installed HEPA filter leak test & Pressure difference across HEPA filter test& Air visualization test & Air borne particle…
Jedco-Compressed Air
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Operation Qualification Protocol (Protocol &Annex) PQP-G-00221 May,2021 Solid and Semi-Solid Area…
Hi Pharm-HVAC TAB & QUALIFICATION
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report (Protocol & Annex) TAB-14821 Nov., 2021 HVAC TAB (AHU 17) 02 HVAC Operation Qualification Report (Protocol & Annex) OQP-H-03321 Nov., 2021 HVAC Operation Qualification (AHU 17)…
GSK,Giza (AHU-3)_(Non-Lactam area )
Sr. Doc. Name Doc No. Issue date Project System 01 Testing, Adjusting & Balancing Report TAB-14721 Apr.,2021 AHU-3 02 Temperature & Relative Humidity test report TRH-00321 Apr.,2021 AHU-3…
Al-Motahedon – Re-Qualification
Sr. Doc. Name Issue date Project System 01 Re-Qualification Protocol & Annex Jan., 2021 Dispensing Area…
Arab Contractors Medical Center / Clean Room
Sr. Doc. Name Issue date Project System 01 Isolator Pharma Gard 797(154310121912) Test Reports (Filter Air velocity verification test & Installed HEPA filter leak test & Pressure difference across HEPA filter test& Air visualization test & Air borne particle count test & Recovery time test) March, 2021 وحدة الكيماوى 02 Lamil Plus 7 (4880-10) Test Reports (Filter Air velocity verification test & Installed HEPA filter leak test & Pressure difference across HEPA filter test& Air visualization test & Air borne…