Author: Ramy Zyada

DEPOT 2

Sr. Doc. Name Doc No. Issue date Project System 1 EXHAUST FAN TESTING, ADJUSTING & BALANCING REPORT FPT-01925 Feb., 2025 Depot 2…

DEPOT 2

Sr. Doc. Name Doc No. Issue date Project System 1 CONCEALED SYSTEM TESTING, ADJUSTING& BALANCING REPORT AFR-00125 Feb., 2025 CONCEALED SYSTEM…

Station 22

Sr. Doc. Name Doc No. Issue date Project System 1 SUPPLY FAN TESTING, ADJUSTING & BALANCING REPORT FPT-03625 Feb., 2025 Station 22…

Total Air-Boutique

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB- 01924 Jul., 2025 Chilled Water system…

Depot 2

Sr. Doc. Name Doc No. Issue date Project System 1 PURGE FAN TESTING, ADJUSTING & BALANCING REPORT FPT-01525 Feb., 2025 Depot 2…

MISR PHARMACETICULES

Sr. Doc. Name Doc No. Issue date Project System 1 Sampling Booth Operation Qualification Report   OQP-L-04125   Feb., 2025 BioCides Area 2 Dispensing Booth Operation Qualification Report   OQP-L-04225   Feb., 2025 BioCides Area…

Pharmascienta Nefertari- OQ

Sr. Doc. Name Issue date Doc. No. Area 01 Pass Boxes & Weighing Booth Operation Qualification (Protocol & Annexes) Feb., 2025 OQP-L-03925 Production Area 02 Installed HEPA Filter Leak Test Report (AHU-42) Feb., 2025 HLT-01225 Production Area 03 Installed HEPA Filter Leak Test Report (AHU-46) Feb., 2025 HLT-01325 Production Area…