Author: Ramy Zyada

SPPF-Qualification AHUs, LAFs & Pass boxes-KSA

Sr. Doc. Name Doc. No Issue date Project System 1.0 SPPF Requalification Protocol (AHU-08, 09 & 16) OQP-H-01023 Sep., 2023 RE-Q Protocol 1.1 SPPF Requalification-Annex (AHU-08) OQP-H-01023/01 Sep., 2023 RE-Q Annex 1.2 SPPF Requalification-Annex (AHU-09) OQP-H-01023/02 Sep., 2023 RE-Q Annex 1.3 SPPF Requalification-Annex (AHU-10) OQP-H-01023/03 Sep., 2023 RE-Q Annex Sr. Doc. Name Doc. No Issue date Project System 1.0 Pass Box Protocol & Annex (APD-046) RQP-L-00723 RQP-L-00723/01 Sep., 2023 RE-Q Protocol & Annex 1.1 Pass Box Protocol & Annex (APD-045)…

(ADCO) -Ground Floor

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Protocol & Annex IQP-H-02023 August,2023 AHUs-(01&02&03 ) 02 HVAC Testing, Adjusting & Balancing Protocol & Annex TAB-08523 August,2023 AHUs-(01&02&03 ) 03 HVAC Operation Qualification Protocol & Annex OQP-H-08823 August,2023 AHUs-(01&02&03 )…

(SAJA PHARMA ) Works in (Production , Dispensing , Micro & Sampling AreaS)

Sr. Doc. Name Doc No. Issue date Project System   LAF Operation Re-Qualification Report (WHE-040)   RQP-L-13523 Aug.,2023 Dispensing Area   LAF Operation Re-Qualification Report (QCE-041)   RQP-L-13623 Aug.,2023 Micro Area   SAFETY CABINRT Operation Re-Qualification Report (QCE-030)   RQP-L-13623 Aug.,2023 –   LAF Operation Re-Qualification Report (QCE-101)   RQP-L-13423 Aug.,2023 Sampling Area   Compressed Nitrogen System Performance Re-Qualification Report   RQP-G-02623 Aug.,2023 Production Area   Compressed Air System Performance Re-Qualification Report   RQP-G-02423 Aug.,2023 Production Area…

Biogeneric-BGP-Testing&Balancing

Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Air Side) TAB-08022 July.2023 (Air Side) 2 Testing, Adjusting & Balancing Protocol& Annex (Chilled&Hot Water Side) TAB-08022 July.2024 (Chilled&Hot Water Side)…