Author: Ramy Zyada

Sunny Pharmaceutical

Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-20525 Aug.,2025 Dispensing Area Pass Box Re-Qualification Protocol RQP-L-24325 Aug.,2025 Dispensing Area Dispensing Booth Re-Qualification Protocol RQP-L-24425 Aug.,2025 Dispensing Area…

Nerhadou

Sr. Doc. Name Doc No. Issue date Project System 01 SAMPLING BOOTH RE-QUALIFICATION REPORT RQP-L-24125 Aug., 2025 Sampling Area 02 DISPENSING BOOTH RE-QUALIFICATION REPORT RQP-L-24225 Aug., 2025 Dispensing Area…

ALANDALOUS

Sr. Doc. Name Doc No. Issue date Project System 01 Sampling Booth Re-Qualification Report RQP-L-23525 Aug., 2025 Sampling Area 02 Pass Boxes Re-Qualification Report RQP-L-23625 Aug., 2025 Micro Area 03 Safety Cabinet Re-Qualification Report RQP-L-23725 Aug., 2025 Micro Area 04 Safety Cabinet Re-Qualification Report RQP-L-23925 Aug., 2025 R & D Area 05 Isolator Re-Qualification Report RQP-L-24025 Aug., 2025 Dispensing Area 06 Air Velocity Verification Test Report FHV-00125 Aug., 2025 Micro Area 07 Air Velocity Verification Test Report FHV-00225 Aug., 2025…

EGYPHAR

Sr. Doc. Name Doc No. Issue date Project System 01 LAF RE-QUALIFICATION REPORT RQP-L-23825 Aug., 2025 Dispensing Area…

protech

Note that it’s for PROTECH  ) works in Production Area Sr. Doc. Name Doc No. Issue date Project System 1 PASS BOXES INSTALLATION QUALIFICATION PROTOCOL IQP-L-20325 Aug,2025 Installation Qualification…

GASCO

Sr. Doc. Name Doc.No Issue date Project system 1 WATER FLOW RATE MEASUREMENTS TEST REPORT WBR-01025 Aug., 2025 Water Side…

PROTECH

Note that it’s for PROTECH  ) works in Production Area Sr. Doc. Name Doc No. Issue date Project System 1 PASS BOXES OPERATION QUALIFICATION PROTOCOL OQP-H-20325 Aug,2025 Operation Qualification…

Nerhadou-Chilled Water Sytem

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Report IQP-H- 03025 Jul., 2025 Chiller 4 02 Chiller Performance Report CPT – 00125 Jul., 2025 Chiller 4…