…
IBN SINA Sawah Warehouse (T)
…
El Razy Pharma
Note that it’s for (El Razy Pharma ) works in (production area) Sr. Doc. Name Doc No. Issue date Project System 01 AIR CHANGE RATE VERIFICATION TEST REPORT ACH-04325 Sep, 2025 Production area 02 ROOM PRESSURE DIFFERENCE VERIFICATION TEST REPORT PDT- 02325 Sep, 2025 Production area 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-04225 Sep, 2025 Production area 04 AIR VISUALIZATION TEST REPORT (NUDAF) AVN-02625 Sep, 2025 Production area 05 AIR BORNE PARTICLE COUNT TEST REPORT PCR-07225 Sep, 2025…
MISR PHARMACETICULES
Sr. Doc. Name Doc. No Issue date Project system 1 AIR CHANGE RATE TEST REPORT( LIQUID & SEMI SOLID AREA ) ACH-04725 Sep, 2025 LIQUID & SEMI SOLID AREA 2 ROOM PRESSURE DIFFERENCE TEST REPORT( LIQUID & SEMI SOLID AREA ) PDT-02625 Sep, 2025 LIQUID & SEMI SOLID AREA…
National Pharmaceutical Factory Co.-Sep., 2025-KSA
Sr. Doc. Name Issue date Doc. No. Area 01 Dispensing Booth Re-Qualification Protocol & Annex (Dispensing Booth / 14 LAF-002) Sep., 2025 RQP-L-11525 Dispensing Area 02 Sampling Booth Re-Qualification Protocol & Annex (Sampling Booth / 14 LAF-001) Sep., 2025 RQP-L-11625 Sampling Area…
NERHADOU-PHASE I & phase II
Doc. Name Doc. No. Issue Date Area HVAC Performance Re-Qualification Protocol QP-H-20825 Aug., 2025 Phase I HVAC Performance Re-Qualification Protocol RQP-H-20925 Aug., 2025 Phase II Installed HEPA Filter Leak Test Report HLT-13825 Sep., 2025 Phase II Installed HEPA Filter Leak Test Report HLT-13925 Sep., 2025 Phase I Air Change Rate Verification Test Report ACH-04625 Sep., 2025 Production Area…
RE-QUALIFICATION PROTOCOL-Clean Air Equipment-Klybeck-KSA
Sr. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol – Clean air Equipment Sept., 2024 RQP-L-11425 Klybeck…
AL-NASR PHARMACEUTICAL CHEMICALS
Sr. Doc. Name Doc No. Issue date Project System 01 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT RQP-G-08325 Sep., 2025 المحاليل 02 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT RQP-G-08425 Sep., 2025 المستحضرات…
NERHADOU Compressed
Note that it’s for Nerhadou ) works in Phase I&II Sr. Doc. Name Doc No. Issue date Project System 1 COMPRESSED AIR SYSTEM PERFORMANCE RE-QUALIFICATION PROTOCOL RQP-L-20325 Sep,2025 Performance Re-Qualification…
EL NILE COMPANY FOR PHARMACEUTICALS & CHEMICAL INDUSTRIES
Sr. Doc. Name Doc. No Issue date Project system 1 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT (Effervescent) RQP-G-08025 Aug, 2025 Effervescent AREA 2 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT(LVP&SVP) RQP-G-07925 Aug, 2025 LVP&SVP AREA 3 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT(Samp&Diss) RQP-G-08125 Aug, 2025 Samp&Diss AREA 4 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT(Semi Solid) RQP-H-18125 Aug, 2025 Semi Solid AREA 5 COMPRESSED AIR SYSTEM RE-QUALIFICATION REPORT(Syrup) RQP-G-07825 Aug, 2025 (Syrup AREA…