Author: Ramy Zyada

Nerhadou

  Sr. Doc. Name Doc No. Issue date Project System 01 LAF re-qualification report (LAF/QC1-027) RQP-L-16025 June, 2025 Micro Lab Area 02 Safety cabinet  re-qualification report (QC1-028) RQP-L-16225 June, 2025 Micro Lab Area…

(Airo Tech)

Sr. Doc. Name Doc. No Issue date Project system 1 WEIGHING BOOTH OPERATION QUALIFICATION PROTOCOL WBR-00625 June, 2025 Bank Misr & El Bank El Ahly…

Servier

Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Re-Qualification Report (LF-3000) RQP-L-16725 June, 2025 Dispensing Area 02 Safety Cabinet Re-Qualification Report (QCM-165) RQP-L-17025 June, 2025 Micro Lab Area…

P&G

Sr. Doc. Name Doc No. Issue date Project System 01 Air Change Rate Test Report ACH-02125 June, 2025 Protected Area 02 Room Temperature and Relative Humidity Test Report TRH-03125 June, 2025 Protected Area 03 Air Borne Particle Count Test Report PCR- 05425 June, 2025 Protected Area…

Gardenia Pharmacy-IQ & OQ-Buffer Area

Sr. Doc. Name Issue date Doc. No. Area 01 HVAC Operation Qualification Protocol & Annex (ACU-01) Jan.,2025 OQP-H-00125 Buffer Area 02 HVAC Installation Qualification Protocol & Annex (ACU-01) Jan.,2025 IQP-H-00125 Buffer Area 03 Turn Over Package Report Jan.,2025 TOP-H-00125 Buffer Area…