Author: Ramy Zyada

LEEDs (Covered Hall) _ TAB Works

ZONE 2 Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-16420 Aug, 2020 TAB / Zone2 02 TAB Report -Annex-01.01 TAB-16420/01 Aug, 2020 TAB / Zone2 03 TAB Report -Annex-01.02 TAB-16420/02 Aug, 2020 TAB / Zone2 ZONE Ground Floor FCUs Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-16520 Aug, 2020 TAB / Ground Floor FCUs 02 TAB Report -Annex-01.01 TAB-16520/01 Aug, 2020 TAB / Ground Floor FCUs…

SEMCO _ TAB &Qualifications

Sr. Doc. Name Issue date Project System 01 Testing, Adjusting & Balancing Report For Warehouse – Air Side In Care Inspection building Sep. 2020 HVAC TAB Qualifications…

EUROPEAN EGYPTIAN PHARMACEUTICAL INDUSTRY _ Compressed Air

Sr. Doc. Name Issue date Project Area 01 Compressed Air & Nitrogen Gas Quality Performance Qualification Protocol Aug., 2020 PRODUCTION &Quality Control DEPARTMENT 02 Compressed Air & Nitrogen Gas Quality Performance Qualification Test Results Aug., 2020 PRODUCTION &Quality Control DEPARTMENT…

Vitabiotic – Test, Balance & Qualification

Sr. Doc. Name Issue date Project System 01 TESTING, ADJUSTING & BALANCING protocol &Annex July,2020 WAREHOUSE 02 TESTING, ADJUSTING & BALANCING protocol &Annex Aug. 2020 Microbiology 03 Operation Qualification protocol &Annex…

Semco-ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT

Sr. Doc. Name Doc. No Issue date Project System 01  ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00220 Jan,2020 Block B – First Floor 02 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00120 Jan,2020 Block B – Ground Floor 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00320 Jan,2020 Block F…