Sr. Doc. Name Doc No. Issue date Project System 01 HVAC OPERATION QUALIFICATION REPORT OQP-H-22525 Sep., 2025 Solid Area…
MARCYRL PHARMA-NON-STERILE & DISPENSING AREA
Doc. Name Doc. No. Issue Date Area HVAC Performance Re-Qualification Protocol RQP-H-20725 SeACRM.,2025 Non-Sterile Area LAF Performance Re-Qualification Protocol RQP-L-27725 Sep.,2025 Dispensing Area Isolator Performance Re-Qualification Protocol RQP-L-27625 Sep.,2025 Dispensing Area Installed HEPA Filter Leak test Report HLT-14325 Sep.,2025 Non-Sterile Area Installed HEPA Filter Leak test Report HLT-14425 Sep.,2025 Non-Sterile Area Installed HEPA Filter Leak test Report HLT-14525 Sep.,2025 Non-Sterile Area…
APEX Pharma-Steam Sterilizer Autoclave-THV-KSA
Sr. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (QCE-022) Sep., 2025 PQP-V-00425 Microbiology Lab (QC014) 02 Re-Qualification Annex (QCE-022) Sep., 2025 PQR-V-00425 Microbiology Lab (QC014) 03 Re-Qualification Turn Over Package (QCE-022) Sep., 2025 TOP-PQ-00425 Microbiology Lab (QC014)…
Ibn Sina Minya Warehouse-Ground Floor
…
EIPICO
Sr. Doc. Name Doc No. Issue date Project System 01 LAFS RE-QUALIFICATION REPORT RQP-L-27325 Sep., 2025 PACKAGING AREA 02 WEIGHING BOOTH RE-QUALIFICATION REPORT RQP-L-27425 Sep., 2025 DISPENSING AREA 03 LAF WEIGHING BOOTH RE-QUALIFICATION REPORT RQP-L-27525 Sep., 2025 SAMPLING AREA…
IFF
Sr. Doc. Name Doc No. Issue date Project System 01 AIR CHANGE RATE MEASUREMENT TEST REPORT ACH-048325 Sep., 2025 Old Production AHU 02 AIR CHANGE RATE MEASUREMENT TEST REPORT ACH-04925 Sep., 2025 Amixon AHU 03 AIR CHANGE RATE MEASUREMENT TEST REPORT ACH-05025 Sep., 2025 Liquid Blending AHU 04 AIR CHANGE RATE MEASUREMENT TEST REPORT ACH-05125 Sep., 2025 Prebatch AHU 05 ROOM PRESSURE DIFFERENCE MEASUREMENT TEST REPORT PDT-02725 Sep., 2025 Old Production AHU 06 ROOM PRESSURE DIFFERENCE MEASUREMENT TEST REPORT PDT-02825…
Quantum
Sr. Doc. Name Doc No. Issue date Project System 01 FCU TESTING, ADJUSTING & BALANCING TEST REPORT AFR-01725 Sep., 2025 Bebabel Restaurant…
Ibn Sina Red Sea Warehouse-Upper Floor
…
Ibn Sina Red Sea Warehouse-Ground Floor
…
Nerhadou Phase II
Note that it’s for (Nerhadou ) works in (Phase II) Sr. Doc. Name Doc No. Issue date Project System 01 Pass Boxes Re-Qualification Report RQP-L-26925 Sep, 2025 Phase II…