| 01 | HVAC Re-Qualification Report | RQP-L-09526 | Jun., 2026 | DISPENSING AREA |
| 02 | HVAC Re-Qualification Report | RQP-L-09626 | Jun., 2026 | STERILE LIQUID PREPARATION & FILLING AREA |
| 03 | HVAC Re-Qualification Report | RQP-L-09726 | Jun., 2026 | STERILE POWDER AREA |
| 04 | LAFS Re-Qualification Report | RQP-L-19126 | Jun., 2026 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 05 | LAFS Re-Qualification Report | RQP-L-19226 | Jun., 2026 | LARGE VOLUME PARENTERAL WASH BAY AND AUTOCLAVES AREA |
| 06 | LAF Re-Qualification Report | RQP-L-19326 | Jun., 2026 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 07 | LAFS Re-Qualification Report | RQP-L-19426 | Jun., 2026 | WASHING BAY AREA |
| 08 | LAF Re-Qualification Report | RQP-L-19526 | Jun., 2026 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 09 | LAFS Re-Qualification Report | RQP-L-19626 | Jun., 2026 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 10 | LAFS Re-Qualification Report | RQP-L-19726 | Jun., 2026 | SMALL VOLUME PARENTERAL TUNNEL, WASH BAY AND AUTOCLAVES AREA |
| 11 | LAFS Re-Qualification Report | RQP-L-19826 | Jun., 2026 | STERILE LIQUID PREPARATION & FILLING AREA |
| 12 | LAFS Re-Qualification Report | RQP-L-19926 | Jun., 2026 | STERILE POWDER AREA |
| 13 | Pass Box Re-Qualification Report | RQP-L-20026 | Jun., 2026 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 14 | Pass Box Re-Qualification Report | RQP-L-20126 | Jun., 2026 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 15 | Pass Box Re-Qualification Report | RQP-L-20226 | Jun., 2026 | NON-STERILE LIQUID AREA |
| 16 | Pass Box Re-Qualification Report | RQP-L-18726 | Jun., 2026 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| 17 | Pass Boxes Re-Qualification Report | RQP-L-18826 | Jun., 2026 | SMALL VOLUME PARENTERAL TUNNEL, WASH BAY AND AUTOCLAVES AREA |
| 18 | Tunnel Re-Qualification Report | RQP-L-18926 | Jun., 2026 | TUNNEL & AUTOCLAVE AREA |
| 19 | Tunnel Re-Qualification Report | RQP-L-19026 | Jun., 2026 | PRODUCTION – NEW FACTORY (WASHING & TUNNEL ROOM) |
| 20 | Tunnel Re-Qualification Report | RQP-L-19126 | Jun., 2026 | PRODUCTION – NEW FACTORY |