| Doc. Name | Doc. No. | Issue Date | Area |
| HVAC Re-Qualification Report | RQP-H-25225 | Nov., 2025 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| HVAC Re-Qualification Report | RQP-H-25325 | Nov., 2025 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| HVAC Re-Qualification Report | RQP-H-24825 | Nov., 2025 | STERILE LIQUID PREPARATION & FILLING AREA |
| HVAC Re-Qualification Report | RQP-H-24925 | Nov., 2025 | Sterile powder area |
| LAFS Re-Qualification Report | RQP-L-32425 | Nov., 2025 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| LAFS Re-Qualification Report | RQP-L-32525 | Nov., 2025 | LARGE VOLUME PARENTERAL WASH BAY AND AUTOCLAVES AREA |
| LAF Re-Qualification Report | RQP-L-33525 | Nov., 2025 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| LAFS Re-Qualification Report | RQP-L-33425 | Nov., 2025 | STERILE POWDER AREA |
| LAF Re-Qualification Report | RQP-L-33325 | Nov., 2025 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| LAFS Re-Qualification Report | RQP-L-32625 | Nov., 2025 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| LAFS Re-Qualification Report | RQP-L-32725 | Nov., 2025 | SMALL VOLUME PARENTERAL TUNNEL, WASH BAY AND AUTOCLAVES AREA |
| LAFS Re-Qualification Report | RQP-L-31225 | Nov., 2025 | STERILE LIQUID PREPARATION & FILLING AREA |
| LAFS Re-Qualification Report | RQP-L-31325 | Nov., 2025 | STERILE POWDER AREA |
| Pass Box Re-Qualification Report | RQP-L-32125 | Nov., 2025 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| Pass Box Re-Qualification Report | RQP-L-33225 | Nov., 2025 | LARGE VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| Pass Box Re-Qualification Report | RQP-L-33625 | Nov., 2025 | NON-STERILE LIQUID AREA |
| Pass Box Re-Qualification Report | RQP-L-32225 | Nov., 2025 | SMALL VOLUME PARENTERAL PREPARATION AND FILLING AREA |
| Pass Boxes Re-Qualification Report | RQP-L-32325 | Nov., 2025 | SMALL VOLUME PARENTERAL TUNNEL, WASH BAY AND AUTOCLAVES AREA |
| Tunnel Re-Qualification Report | RQP-L-33125 | Nov., 2025 | TUNNEL & AUTOCLAVE AREA |
| Tunnel Re-Qualification Report | RQP-L-33025 | Nov., 2025 | PRODUCTION – NEW FACTORY (WASHING & TUNNEL ROOM) |
| Tunnel Re-Qualification Report | RQP-L-32925 | Nov., 2025 | PRODUCTION – NEW FACTORY |