| Sr. | Doc. Name | Doc No. | Issue date | Project System |
| 01 | HVAC RE-QUALIFICATION REPORT | RQP-H-03526 | Feb., 2026 | DISPENSING AREA |
| 02 | HVAC RE-QUALIFICATION REPORT | RQP-H-03426 | Feb., 2026 | Sampling Area |
| 03 | HVAC RE-QUALIFICATION REPORT | RQP-H-03526 | Feb., 2026 | Solid Area (AHU-14) |
| 04 | HVAC RE-QUALIFICATION REPORT | RQP-H-03626 | Feb., 2026 | Solid Area (AHU-21) |
| 05 | HVAC RE-QUALIFICATION REPORT | RQP-H-03726 | Feb., 2026 | Solid Area |
| 06 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03326 | Feb., 2026 | Coating Area |
| 07 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03426 | Feb., 2026 | Coating Area |
| 08 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03526 | Feb., 2026 | Preparation Area |
| 09 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03626 | Feb., 2026 | Coating Area |
| 10 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03726 | Feb., 2026 | Preparation Line /P110 |
| 11 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03826 | Feb., 2026 | Preparation Line /P110 |
| 12 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-03926 | Feb., 2026 | Preparation Area |
| 13 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-04026 | Feb., 2026 | Coating Area |
| 14 | AIR CHANGE RATE VERIFICATION TEST REPORT | ACH-00626 | Feb., 2026 | Solid Area |
| 15 | ROOM PRESSURE DIFFERENCE VERIFICATION TEST REPORT | PDT-02426 | Feb., 2026 | Solid Area |
| 16 | AIR VISUALIZATION TEST REPORT | AVN-02626 | Feb., 2026 | Solid Area |
| 17 | AIR BORNE PARTICLE COUNT TEST REPORT | PCR-00726 | Feb., 2026 | Solid Area |
| 18 | RECOVERY TIME TEST REPORT | RRT-01226 | Feb., 2026 | Solid Area |
| 19 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-05826 | Mar., 2026 | semi-Solid Area |
| 20 | INSTALLED HEPA FILTER LEAK TEST REPORT | HLT-05926 | Mar., 2026 | semi-Solid Area |
| 21 | FUMING HOOD RE-QUALIFICATION TEST REPORT | FHV-00226 | Mar., 2026 | Micro Lab Area |