Category: Uncategorized

Unicare-Riydh Pharma TAB Project

Sr. Doc. Name Doc. No Issue date Project System 1.0 Riyadh Pharma TAB Protocol TAB-00323/00 Mar., 2023 TAB Protocol 1.1 FAHU 1-Annex 1 TAB-00323/01 Mar., 2023 TAB Annex 1.2 AHU 1-Annex 2 TAB-00323/02 Mar., 2023 TAB Annex 1.3 AHU 2-Annex 3 TAB-00323/03 Mar., 2023 TAB Annex 1.4 AHU 3-Annex 4 TAB-00323/04 Mar., 2023 TAB Annex 1.5 AHU 4-Annex 5 TAB-00323/05 Mar., 2023 TAB Annex 1.6 AHU 5-Annex 6 TAB-00323/06 Mar., 2023 TAB Annex 1.7 AHU 6-Annex 7 TAB-00323/07 Mar., 2023…

(Hikma) Works in (Recovery)

Sr. Doc. Name Doc No. Issue date Project System 01  Recovery Test Reports From (RRT-01323 To RRT-09223) From (RTT-09323 To RTT-09423) Apr.2023 AHU-01 ,02,3A,3B,04,05,07,10,11,12&13…

(Al Andalous) (Solid Area )

Sr. Doc. Name Doc No. Issue date Project System   Operation Re-Qualification Protocol & Annex for Solid Area OQP-H02123 Jan., 2023 AHUs (04,05,06,15,16,19,20,23,24,25 & 28)…

SEDICO Pass boxes Solid Area

Sr. Doc. Name Doc No. Issue date Project System   Operation Re-Qualification Protocol & Annexes for Bass Boxes in Solid Area RQP-L-04523 April, 2023 Pass Box (SD-09) Pass Box (SD-11)…

(NERHADOU) (AHU -02 & 07)

Sr. Doc. Name Doc No. Issue date Project System   Installed HEPA Filter Leak Test Reports From( HLT-02123) TO (HLT-03523) Apr.,2023 AHU -02 & 07   Air Change Rate Test Reports From( ACH-03723) TO (ACH-04323) Apr.,2023 AHU -02 & 07   Air Visualization Test Reports From( AVN-04723) TO (AVN-05123) Apr.,2023 AHU -02 & 07   RECOVERY RATE  Test REPORT  From( RRT-00623) TO (RRT-01023) Apr.,2023 AHU -02 & 07   ROOM PRESSURE  Test REPORT  PDT-00623 Apr.,2023 AHU -02 & 07  …

Neuroespitalia Hospital

S.N Doc. Name Doc No. Issue date Project System 1 Terminal HEPA Filter Leak test From (HLT-01623/01 to HLT-01623/06) Mar.2023 AHUs (5,6,7,9,10,17,19,21,20) EX.Fan 2 Absolute HEPA Filter Leak test From (HLT-01723/01 to HLT-01723/09) Apr.2023 AHUs (5,6,7,9,10,17,19,21,20)…

Servier RQ

S.N Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re- Qualification Protocol & Annex RQP-H-04323 Apr.2023 AHU-01…

jamjoom- Passbox&Compressed

S.N Doc. Name Doc No. Issue date Project System 1 INSTALLED HEPA FILTER LEAK TEST REPORT  HLT-03823 Mar.2023 Passbox/ED-226 2 FILTER AIR VELOCITY TEST REPORT  FVT-01223 Mar.2023 Passbox/ED-226 3 PRESSURE DIFFRENCE  ACROSS HEPA FILTER TEST REPORT  PDH-00223 Mar.2023 Passbox/ED-226 4 AIR VISUALIZATION  TEST REPORT  AVU-01323 Mar.2023 Passbox/ED-226 5 PARTICLE COUNT TEST REPORT  PCR-01023 Mar.2023 Passbox/ED-226 6 RECOVERY TEST REPORT  RTT00523 Mar.2023 Passbox/ED-226 7 Oil Content Test Report CAQ-01223/2 Apr.2023 Compressed…

Egyphar old factory RQ

S.N Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re- Qualification Protocol & Annex OQP-H02923 Apr.2023 Micro Area 2 LAFS Operation Re- Qualification Protocol & Annex RQP-L-04123 Apr.2023 LAFs 3 PBS Operation Re- Qualification Protocol & Annex RQP-L-04223 Apr.2023 Passboxes…